HPERC · Himachal Pradesh Electricity Regulatory Commission
MYT Generation Formats
OrderDated 30 Nov 2016
Replaced by Hydro Generation Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Hydro Generation Tariff Regulations, 2011.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal- (a) anything done or any action taken or purported to have been done or taken under the repealed Regulations shall, in so far as it is not inconsistent with the provisions of these Regulations, be deemed to have been done or taken under the corresponding provisions of these Regulations; (b) the provisions concerning the tariff order made for the control period ending on the 31st March, 2024 and the provisions for conduct of the proceedings (including review petitions) for its revocations, variation or alternation as, stood before such repeal, shall continue to be in force.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a compendium of prescribed filing formats — the "Index of Formats" (p1) — through which a generating company builds up and submits a Multi-Year Tariff (MYT) petition for its generating stations. The formats run across two previous years, the current year and a control period of four forward years, with a corresponding generation programme stated as 2008-09 to 2013-14 (p1–2, p28). No issuing Commission, regulation number or issue date appears anywhere in the text; every date in the document is embedded in the forms themselves.
The summary formats S1–S4 (p2–5) give the revenue-requirement build-up: generation, receipts and expenditure heads in S1; equity and return on equity in S2, with a post-tax return-on-equity rate stated as a rule rather than a filled value; hydro station parameters in S3 (installed capacity, free power to the home state, date of commercial operation, station type, design energy, normative plant availability factor, maintenance spares and receivables for working capital, base return on equity, tax rate and the SBI prime lending rate); and the salient features of a hydro project in S4, with a note requiring disclosure of limitations on generation arising from competing water uses (p5).
O&M is handled in F1–F2 (p6–8): F1 sets out the calculation of base O&M from actual expenses after stripping abnormal items, normalised and escalated to a stated price level, with an alternative project-cost-based formula for new stations; F2 breaks O&M down by head and employee category and, on the following page, sets out the allocation of corporate expenses to functional activities and then to individual stations, with notes requiring justification of large year-on-year increases and data based on audited balance sheets.
The capital-cost block F3–F6 (p9–15) covers admitted capital cost of existing projects, capital cost estimates and commissioning schedules for new projects, a hydro-specific cost break-up, the plant-and-equipment split, the financial package up to COD, additional capitalisation after COD and its financing.
F7 (p16–17) is a detailed fixed-asset and depreciation schedule by asset class with depreciation rates. F8A–F8E (p18–22) capture project-specific and foreign loans, the weighted average rate of actual loans, the quarterly draw-down schedule used to compute interest during construction and financing charges, and the allocation of corporate loans to projects. F9–F13A (p23–29) cover capitalised expenses, grants and subsidies towards capital assets, share capital and reserves, working capital, project-wise capital expenditure and capital works in progress.
Page 1 also carries a checklist of supporting documents — incorporation and commencement certificates, audited station-wise and corporate accounts, loan agreements, cost and financial-package approvals, equity participation agreements and BPSA/PPA with beneficiaries.
Read with this
The regulation
- Dated 1 Apr 2011Hydro Generation Tariff Regulations, 2011
Amendments and corrections
- Dated 30 Jul 2011Hydro Generation Tariff (First Amendment) Regulations, 2011
- Dated 1 Nov 2013Hydro Generation Tariff Regulations, 2011 — Second Amendment, 2013
- Dated 22 Nov 2018Hydro Generation Tariff Regulations, 2011 — Third Amendment, 2018
Commencement notices and reasons
Procedures and orders made under it
- Dated 2 Apr 2011Multi Year Control Period Notification for the Generating Company, 2011
- Dated 2 Apr 2011Formats for Multi Year Tariff Filings by the Generating Company Order, 2011
- Dated 30 Nov 2016Index of Formats
Earlier drafts
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.