HPERC · Himachal Pradesh Electricity Regulatory Commission

Multi Year Control Period Notification for the Generating Company, 2011

Notification of Multi Year Control Period for the Generating Company

OrderDated 2 Apr 2011No. HPERC/Gen/479 dated 02.04.2011

Replaced by Hydro Generation Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Hydro Generation Tariff Regulations, 2011.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal- (a) anything done or any action taken or purported to have been done or taken under the repealed Regulations shall, in so far as it is not inconsistent with the provisions of these Regulations, be deemed to have been done or taken under the corresponding provisions of these Regulations; (b) the provisions concerning the tariff order made for the control period ending on the 31st March, 2024 and the provisions for conduct of the proceedings (including review petitions) for its revocations, variation or alternation as, stood before such repeal, shall continue to be in force.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A single-page notification from the Himachal Pradesh Electricity Regulatory Commission fixing the multiyear control period for hydro generation tariff determination. Issued on 02.04.2011 under clause (13) of regulation 3 of the HPERC (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011, it declares a three-year control period running from 01.04.2011 (p1). The notification contains no tariff numbers, no normative parameters and no list of affected licensees; its only operative content is the length and start date of the control period that the 2011 hydro tariff regulations will use (p1). It is signed by order of the Commission by the Secretary (p1). For an analyst, its value is as the dated trigger that starts the first MYT block under the 2011 hydro regulations — it defines the window within which hydro generating companies' tariffs are set, not the tariffs themselves.

Standard name
Generation Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Generation tariff

Read with this

The regulation

Commencement notices and reasons

Procedures and orders made under it

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.