HPERC · Himachal Pradesh Electricity Regulatory Commission
Multi Year Control Period Notification for the Generating Company, 2011
Notification of Multi Year Control Period for the Generating Company
OrderDated 2 Apr 2011No. HPERC/Gen/479 dated 02.04.2011
Replaced by Hydro Generation Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Hydro Generation Tariff Regulations, 2011.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal- (a) anything done or any action taken or purported to have been done or taken under the repealed Regulations shall, in so far as it is not inconsistent with the provisions of these Regulations, be deemed to have been done or taken under the corresponding provisions of these Regulations; (b) the provisions concerning the tariff order made for the control period ending on the 31st March, 2024 and the provisions for conduct of the proceedings (including review petitions) for its revocations, variation or alternation as, stood before such repeal, shall continue to be in force.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
A single-page notification from the Himachal Pradesh Electricity Regulatory Commission fixing the multiyear control period for hydro generation tariff determination. Issued on 02.04.2011 under clause (13) of regulation 3 of the HPERC (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011, it declares a three-year control period running from 01.04.2011 (p1). The notification contains no tariff numbers, no normative parameters and no list of affected licensees; its only operative content is the length and start date of the control period that the 2011 hydro tariff regulations will use (p1). It is signed by order of the Commission by the Secretary (p1). For an analyst, its value is as the dated trigger that starts the first MYT block under the 2011 hydro regulations — it defines the window within which hydro generating companies' tariffs are set, not the tariffs themselves.
Read with this
The regulation
- Dated 1 Apr 2011Hydro Generation Tariff Regulations, 2011
Amendments and corrections
- Dated 30 Jul 2011Hydro Generation Tariff (First Amendment) Regulations, 2011
- Dated 1 Nov 2013Hydro Generation Tariff Regulations, 2011 — Second Amendment, 2013
- Dated 22 Nov 2018Hydro Generation Tariff Regulations, 2011 — Third Amendment, 2018
Commencement notices and reasons
Procedures and orders made under it
- Dated 2 Apr 2011Formats for Multi Year Tariff Filings by the Generating Company Order, 2011
- Dated 30 Nov 2016MYT Generation Formats
- Dated 30 Nov 2016Index of Formats
Earlier drafts
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.