HPERC · Himachal Pradesh Electricity Regulatory Commission
Hydro Generation Tariff (Third Amendment) Regulations, 2018 — Statement of Reasons
In the matter of formulation of the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) (Third Amendment) Regulations, 2018.
Statement of reasonsDated 22 Nov 2018
Replaced by Hydro Generation Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Hydro Generation Tariff Regulations, 2011 or one of its amendments.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal- (a) anything done or any action taken or purported to have been done or taken under the repealed Regulations shall, in so far as it is not inconsistent with the provisions of these Regulations, be deemed to have been done or taken under the corresponding provisions of these Regulations; (b) the provisions concerning the tariff order made for the control period ending on the 31st March, 2024 and the provisions for conduct of the proceedings (including review petitions) for its revocations, variation or alternation as, stood before such repeal, shall continue to be in force.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Statement of Reasons (p1) issued with the HPERC (Terms and Conditions for Determination of Hydro Generation Tariff) (Third Amendment) Regulations, 2018. Section 1 sets out the background: the draft amendment was published in Rajpatra Himachal Pradesh on 08.10.2018 under s.61, s.62(1), s.86(1) and s.181(2)(zd) of the Electricity Act 2003; objections were invited through two newspapers on 10 November 2018 with 21 days allowed, and a public hearing was held on 17.11.2018. Only HPSEBL filed comments.
Section 2 records the three issues raised and the Commission's view on each (pp2–3). On carrying cost for true-up (proposed new Regulation 9-A), HPSEBL argued for 350 basis points; the Commission kept its own rate but changed the reference from the SBI MCLR as on 1 April to the weighted average SBI MCLR during the year (p2). On refund of excess amount recovered above tariff (Regulation 10) and on interest on working capital (Regulation 19), HPSEBL again sought 350 basis points and the Commission declined to revise its rate, finding no merit (pp2–3). The document is signed at Shimla on 22.11.2018 by the Member and Chairman (p3).
Read with this
The regulation
- Dated 1 Apr 2011Hydro Generation Tariff Regulations, 2011
Amendments and corrections
- Dated 30 Jul 2011Hydro Generation Tariff (First Amendment) Regulations, 2011
- Dated 1 Nov 2013Hydro Generation Tariff Regulations, 2011 — Second Amendment, 2013
- Dated 22 Nov 2018Hydro Generation Tariff Regulations, 2011 — Third Amendment, 2018
Procedures and orders made under it
- Dated 2 Apr 2011Multi Year Control Period Notification for the Generating Company, 2011
- Dated 2 Apr 2011Formats for Multi Year Tariff Filings by the Generating Company Order, 2011
- Dated 30 Nov 2016MYT Generation Formats
- Dated 30 Nov 2016Index of Formats
Earlier drafts
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.