HPERC · Himachal Pradesh Electricity Regulatory Commission
Index of Formats
INDEX OF FORMATS
OrderDated 30 Nov 2016
Replaced by Hydro Generation Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Hydro Generation Tariff Regulations, 2011.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal- (a) anything done or any action taken or purported to have been done or taken under the repealed Regulations shall, in so far as it is not inconsistent with the provisions of these Regulations, be deemed to have been done or taken under the corresponding provisions of these Regulations; (b) the provisions concerning the tariff order made for the control period ending on the 31st March, 2024 and the provisions for conduct of the proceedings (including review petitions) for its revocations, variation or alternation as, stood before such repeal, shall continue to be in force.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a set of filing formats, not a narrative regulation. It tells a hydro generating company what schedules, financial statements and supporting documents to file for a multi-year tariff (MYT) / annual revenue requirement exercise before HPERC. Page 1 lists the summary forms S1–S4 and financial forms F1–F13A, a checklist of “Other Information/Documents” (incorporation papers, audited accounts, loan agreements, capital-cost approvals, equity agreements, BPSA/PPA, time/cost overrun note) and brief instructions for the applicant.
The summary formats (pp2–7) cover the annual revenue requirement, return on equity, hydro station parameters (installed capacity, free power, COD, station type, excitation, design energy, availability factor and auxiliary consumption) and monthwise design energy with peaking or continuous MW for ROR pondage/storage and ROR stations; a note asks for any water-use restrictions.
The O&M formats (pp8–13) set out the base O&M calculation and escalation, then detailed break-ups for employee costs, repair & maintenance and administrative & general expenses, including corporate-office allocation and employee numbers. Several notes require audited balance-sheet data, separate disclosure of abnormal expenses and prior-period arrears.
Capital and financing formats (pp15–27) cover capital-cost estimates and commissioning schedules for new projects, break-up of hydro plant and equipment cost, financial package up to COD, additional capitalisation, fixed assets and depreciation, and loan details — project-specific loans, foreign loans, weighted-average interest, drawdown schedules for IDC and financing charges, and allocation of corporate loans.
The remaining forms (pp28–34) cover expenses capitalised, contributions/grants/subsidies, share capital and reserves, working capital requirements, project/scheme-wise capex and capital works in progress. The formats use relative years FY(n-3) to FY(n+5); p8 maps these to FY 2010-11–FY 2012-13 (historical), FY 2013-14 (current year) and FY 2014-15–FY 2018-19 (control period), and Form 13A is headed “GENERATION PROGRAMME FROM 2014-15 TO 2018-19” (pp33–34). No issue, gazette or in-force date is printed.
Read with this
The regulation
- Dated 1 Apr 2011Hydro Generation Tariff Regulations, 2011
Amendments and corrections
- Dated 30 Jul 2011Hydro Generation Tariff (First Amendment) Regulations, 2011
- Dated 1 Nov 2013Hydro Generation Tariff Regulations, 2011 — Second Amendment, 2013
- Dated 22 Nov 2018Hydro Generation Tariff Regulations, 2011 — Third Amendment, 2018
Commencement notices and reasons
Procedures and orders made under it
- Dated 2 Apr 2011Multi Year Control Period Notification for the Generating Company, 2011
- Dated 2 Apr 2011Formats for Multi Year Tariff Filings by the Generating Company Order, 2011
- Dated 30 Nov 2016MYT Generation Formats
Earlier drafts
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.