HPERC · Himachal Pradesh Electricity Regulatory Commission
Hydro Generation Tariff Regulations, 2011
Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011
RegulationDated 1 Apr 2011No. HPERC/Gen/479.- dated the 1st April, 2011
Replaced by Hydro Generation Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal- (a) anything done or any action taken or purported to have been done or taken under the repealed Regulations shall, in so far as it is not inconsistent with the provisions of these Regulations, be deemed to have been done or taken under the corresponding provisions of these Regulations; (b) the provisions concerning the tariff order made for the control period ending on the 31st March, 2024 and the provisions for conduct of the proceedings (including review petitions) for its revocations, variation or alternation as, stood before such repeal, shall continue to be in force.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Himachal Pradesh Electricity Regulatory Commission's notification of 1 April 2011 making the HPERC (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011 (p1). The preamble records that the Commission is about to determine generation tariff for a control period starting 1 April 2011 and that the National Tariff Policy and the Central Commission's 2009 tariff regulations have moved on, so the existing 2007 hydro tariff regulations have to be replaced (p1). It is made under section 181(2)(zd)–(zf) read with sections 61, 62 and 86 of the Electricity Act 2003, extends to the whole of Himachal Pradesh and comes into force on 1 April 2011 (p1–2).
Part I (p2–6) fixes scope and vocabulary. The regulations apply wherever the Commission determines tariff for a hydro generating station or unit under section 62, but tariff under an existing PPA, under a Commission-approved PPA, or adopted from a transparent Central Government bidding process is dealt with under those instruments instead (p2). The definitions (p2–6) set the terms the rest of the document runs on — COD, declared capacity, design energy, NAPAF, plant availability factor, cut-off date, existing and new station, infirm power and useful life, with notes on COD for pondage/storage and run-of-river plants.
Part II (p6–8) is the framework: a multi-year tariff built on an approved business plan, tariff forecast and performance trajectory; baselines; approval of capital investment plans; targets confined to controllable parameters; true-up at the end of the control period with O&M surpluses or deficits left with the generating company and force majeure effects passed through; and refund of excess recovery with interest (p8).
Part III (p9–17) is the costing methodology — capital cost and the spares ceiling, heads of additional capitalisation, renovation and modernisation approval, infirm power as UI, debt-equity treatment for existing stations, new stations and R&M, interest and finance charges, working capital and its interest, depreciation, return on equity with a grossing-up formula, and O&M expense build-up by station vintage.
Part IV (p17–23) sets operating norms — NAPAF criteria by plant type, auxiliary consumption ceilings, ceiling/relaxation rules and the PPA override — then how tariff is computed: annual fixed cost components, capacity and energy charge formulas, treatment of design-energy shortfalls, UI, billing, late payment, rebate, scheduling, penalties for mis-declared capacity, metering and safety. Part V (p23–25) lays down the filing sequence — business plan, tariff application, review, disposal and publication. Part VI (p25–28) covers CDM benefit sharing, tax, forex hedging, transitory provisions, repeal and savings and the Commission's residual powers. The Appendix (p29–30) gives asset-wise depreciation rates.
Read with this
Amendments and corrections
- Dated 30 Jul 2011Hydro Generation Tariff (First Amendment) Regulations, 2011
- Dated 1 Nov 2013Hydro Generation Tariff Regulations, 2011 — Second Amendment, 2013
- Dated 22 Nov 2018Hydro Generation Tariff Regulations, 2011 — Third Amendment, 2018
Commencement notices and reasons
Procedures and orders made under it
- Dated 2 Apr 2011Multi Year Control Period Notification for the Generating Company, 2011
- Dated 2 Apr 2011Formats for Multi Year Tariff Filings by the Generating Company Order, 2011
- Dated 30 Nov 2016MYT Generation Formats
- Dated 30 Nov 2016Index of Formats
Earlier drafts
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.