Hydro Generation Tariff Regulations, 2011 — Third Amendment, 2018
Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) (Third Amendment) Regulations, 2018
AmendmentDated 22 Nov 2018No. HPERC-F(1)-2/2018 dated 22nd November, 2018
Replaced by Hydro Generation Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Hydro Generation Tariff Regulations, 2011.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal- (a) anything done or any action taken or purported to have been done or taken under the repealed Regulations shall, in so far as it is not inconsistent with the provisions of these Regulations, be deemed to have been done or taken under the corresponding provisions of these Regulations; (b) the provisions concerning the tariff order made for the control period ending on the 31st March, 2024 and the provisions for conduct of the proceedings (including review petitions) for its revocations, variation or alternation as, stood before such repeal, shall continue to be in force.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the third amendment to HPERC's 2011 hydro generation tariff regulations, notified at Shimla on 22 November 2018 and taking effect from publication in the Himachal Pradesh Rajpatra (p1–2). The Commission's stated reasons are to align the parent regulations with the National Tariff Policy 2016, with the Central Commission's methodologies and with two of its own later instruments — the 2015 terminal benefits sharing regulations and the 2014 power regulatory accounting regulations — and to review working-capital interest benchmarking and fill gaps and discrepancies, ahead of determining tariffs for the control period beginning 1 April 2019 (p1).
Regulation 2 rewrites the definitional regulation 3: it adds "accounting statements", "MCLR" and "prudence check", replaces "change in law" with a multi-limb event list covering new law, amendments, judicial reinterpretation, changed consents and bilateral or multilateral treaties, inserts a "force majeure event" definition, and refreshes the residual interpretation clause so undefined words take their Act or Grid Code meanings (p2–3).
Regulation 3 inserts a carrying-cost entitlement on true-up amounts that differ from what the tariff order approved, in either direction, benchmarked to one-year SBI MCLR plus a spread (p3). Regulation 4 replaces the rule on refund of excess amounts with an obligation to refund over-recoveries to beneficiaries with interest, ring-fenced from the Aggregate Revenue Requirement and separately recorded (p3–4). Regulation 5 inserts regulations 10-A to 10-C: an accounting manual and annual regulatory audited accounts under the 2014 accounting regulations; mandatory plant-wise segregation of accounts with a reasonable joint-cost allocation basis; and treatment of consumer contribution, deposit works, grants and capital subsidy, excluding such funding from debt-equity, depreciation, return on equity and interest computations while keeping normative O&M allowable (p4–5).
The remaining regulations touch cost and return mechanics: additional capital expenditure admissible after the cut-off date on prudence check, with minor assets excluded (p5–6); interest on loan moved to a weighted-average actual-loan-portfolio rate with a fallback and a refinancing benefit-sharing rule (p6); interest on working capital set on a normative MCLR-linked basis regardless of actual borrowing (p6); salvage value and depreciable value restated with hydro-specific provisos tied to the developer's agreement with the State Government and to the share of long-term PPA sales (p7); and O&M expense norms fixed by plant vintage, plus a new requirement to disclose terminal-benefit sharing (p7–8).
Read with this
The regulation
- Dated 1 Apr 2011Hydro Generation Tariff Regulations, 2011
Amendments and corrections
- Dated 30 Jul 2011Hydro Generation Tariff (First Amendment) Regulations, 2011
- Dated 1 Nov 2013Hydro Generation Tariff Regulations, 2011 — Second Amendment, 2013
Commencement notices and reasons
Procedures and orders made under it
- Dated 2 Apr 2011Multi Year Control Period Notification for the Generating Company, 2011
- Dated 2 Apr 2011Formats for Multi Year Tariff Filings by the Generating Company Order, 2011
- Dated 30 Nov 2016MYT Generation Formats
- Dated 30 Nov 2016Index of Formats
Earlier drafts
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.