Search the library
Filters
Topicclear
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
Showing the best matches for “energy storage obligation”: 9 documents. There may be more. Add words, or choose a regulator or a type, to narrow the search.
The state and topic filters do not apply to a word search yet; the regulator, document type and year filters do.
Procurement of Energy Renewable Sources and its Compliance Regulations, 2021
- … (MGO) means Mini-Grid Operator as defined in OERC (Mini-Grid Renewable Energy Generation and Supply) Regulations, 2019. (n) MNRE means the Ministry of New and Renewable Energy, Government of India; …
- 4. Purchase Obligation from Renewable Sources… Provided further that large hydropower projects including pumped storage projects having capacity of more than 25 MW (LHPs) which came into commercial operation after 08.03.2019 will be considered as renewable energy source. …
3 matching passages in this document
Framework for Resource Adequacy Regulations, 2024
- RPO constraintsFulfilment of Renewable Purchase Obligation shall be considered as one of the objectives of Resource Adequacy. Technology options like renewable generation for round the clock energy supply backed with storage (Battery and PSP), …
- RPO constraints › Storage constraintsStorage constraints: Due to the intermittent nature of renewable generation, the need for resources which can store surplus energy and despatch the stored energy during low RE periods becomes vital. …
3 matching passages in this document
Generation Tariff Regulations, 2024
- (g) Norms for consumption of reagent › 50. NORMS OF OPERATION FOR HYDRO GENERATING STATION… beneficiaries shall be entitled to an equivalent energy of 75% of the energy utilized in pumping the water from the lower elevation reservoir to the higher elevation reservoir from the generating station during peak hours, …
- 40. LANDED COST OF REAGENT › 46. COMPUTATION AND PAYMENT OF CAPACITY CHARGE AND ENERGY …… COMPUTATION AND PAYMENT OF CAPACITY CHARGE AND ENERGY CHARGE FOR PUMPED STORAGE HYDRO GENERATING STATIONS (1) The fixed cost of a pumped storage hydro generating station shall be computed on annual basis, based on norms specified under …
3 matching passages in this document
Promotion of Renewable Energy through Green Energy Open Access Regulations, 2023
- PRELIMINARY › 5. Purchase Obligation from Renewable SourcesThe Green Energy purchased from distribution licensee/GRIDCO or from Renewable Energy sources other than distribution licensee/GRIDCO in excess of its Renewable Purchase Obligation (RPO) …
- PRELIMINARY › 5. Purchase Obligation from Renewable SourcesThere shall be a uniform renewable purchase obligation, on all obligated entities in the area of supply / operation of a distribution licensee. Any entity, whether obligated or not, may elect to generate, …
3 matching passages in this document
Odisha Distribution (Conditions of Supply) Code, 2019
3 amendments on Voltaic
- CHAPTER VII SYSTEM OF SUPPLY › ASSESSMENT OF UNAUTHORISED USE AND THEFT OF ELECTRICITY… If it is found that energy supplied is used for a purpose other than for which usage of electricity was authorized and/or energy is utilized for the premises/areas other than the premises/area for which the supply of electricity was …
- 1. SHORT TITLE, COMMENCEMENT › 2. DEFINITIONS AND INTERPRETATIONS… means an equipment used for measuring electrical quantities like energy in kWh or KVAh, maximum demand in kW or KVA, reactive energy in KVAR hours etc. including accessories like Current Transformers (CT)and Potential Transformers (PT) …
3 matching passages in this document
Odisha Grid Code Regulations, 2015
- 10.6 REGULATORY REQUIREMENTS OF SPECIAL ENERGY METERSThe Special energy meters shall be static type, composite meters, installed circuit-wise, as self-contained devices for measurement of active and reactive energy, and certain other parameters as described in the following sections. …
- 6.8 DATA REQUIREMENTS › Annexure-1 to Chapter-6 {Refer Clause 6.1 (c)} …… pay to the SGS Capacity charges corresponding to plant availability and Energy charges for the scheduled despatch, as per the relevant notifications and orders of OERC. The bills for these charges shall be issued by the respective SGS to …
3 matching passages in this document
Draft Renewable Purchase Obligation Regulations, 2026
Draft- 6. Energy Storage Obligation… Energy Storage Obligation 6.1 The following percentage of total energy consumed shall be renewable energy along with/through storage as provided in Table-2 below: Table-2 Sl. No. …
- 1. SHORT TITLE AND COMMENCEMENT › 2. DEFINITIONS AND INTERPRETATION"Energy Storage Obligation" or "ESO" means the obligation of an obligated entity to source a portion of the energy from Energy Storage Systems established as standalone ESS or in combination with RE sources, …
3 matching passages in this document
Procurement of Energy from Renewable Sources and its Compliance Regulations, 2024 — Draft
Draft- NoteFinancial Year Storage (on Energy Basis) 2024-25 1.5% 2025-26 2.0% 2026-27 2.5% 2027-28 3.0% 2028-29 3.5% 2029-30 4.0% 4.8 The Energy Storage Obligation shall be calculated in energy terms as a percentage of …
- Note… to meet the shortfall in achievement of stipulated Wind Renewable Energy or Hydro Renewable Energy Consumption. 4.5 In case of Hybrid Sources, the power procured from the hybrid project may be used for fulfillment of Wind Renewable …
2 matching passages in this document
RCO, DRES and RE Linked Concepts Regulations, 2026 — Draft
Draft- ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK … › ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK …"Energy Storage Obligation" or "ESO" means the obligation of an obligated entity to source a portion of the energy from Energy Storage Systems established as standalone ESS or in combination with RE sources, …
- ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK … › 5. Renewable Consumption Obligation… 5.2 The obligation under the Wind energy component shall be met by energy produced from Wind Power Projects commissioned after 31st March, 2024. 5.3 The obligations under the Hydro energy component shall be met by energy produced from …
2 matching passages in this document