Short Term Open Access Regulations, 2010

Himachal Pradesh Electricity Regulatory Commission (Short Term Open Access) Regulations, 2010

RegulationDated 2 May 2010No.HPERC/418.- dated 2nd May, 2010

2 amendments to it are on Voltaic, the latest dated 30 Aug 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HPERC's principal regulation for short-term open access — up to one month at a time — on the intra-State transmission and distribution systems of Himachal Pradesh, notified on 2 May 2010 and brought into force from publication in the Rajpatra (p1).

Chapter I (pp1–3) states the title, commencement and extent — applications for short-term open access energy transfer schedules within the State, including where the State system is used with the inter-State system — and defines the working vocabulary: open access customer and transaction, intra-State entity, nodal agency (the SLDC), time block, and the long-, medium- and short-term access periods that fix who is covered.

Chapter II (pp3–9) governs transmission access. It conditions access on surplus capacity arising from design margins, flow variation and spare capacity built for future load growth, and sets a priority order topped by distribution licensees buying renewable and cogeneration power and tailed by captive plants and other customers, with power for the Commission to review that order to develop the market. The nodal agency must place a detailed procedure before the Commission within 90 days after public comment. The chapter then provides the application and non-refundable fee, the four-month advance scheduling calendar alongside first-come-first-served and day-ahead windows, contingency scheduling, congestion management by electronic bidding, cancellation and downward revision on minimum notice, SLDC curtailment with reverse curtailment priority, capacity determination and dispute reference to the Commission, and the charges regime — transmission, operating, default interest, UI and reactive energy — with collection and disbursement split between the licensee and long-term customers.

Chapter III (pp9–12) applies regulations 3–15 mutatis mutandis to distribution open access from one (1) MW and above, adding wheeling charges, per-day operating charges, cross-subsidy surcharge (not on captive customers), default and reactive-energy rules, its own 25/75 disbursement, and the distribution licensee's duty to keep non-discriminatory flow and to resume supply once access ends.

Chapter IV (pp12–14) covers metering, energy-loss absorption, barring wilful defaulters, SLDC website disclosure, communication facilities, code compliance and grievance redressal, then savings, general conditions, power to remove difficulties and repeal of the 2005 open access regulations.

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Scheduling and despatch

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.