HPERC · Himachal Pradesh Electricity Regulatory Commission
Short Term Open Access Regulations, 2010 — First Amendment, 2018 — Order
In the matter of formulation of the Himachal Pradesh Electricity Regulatory Commission (Short Term Open Access) (First Amendment) Regulations, 2018.
OrderDated 11 Jun 2018Published in the Gazette 20 Mar 2018
Made under the Short Term Open Access Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is HPERC's order disposing of objections to, and approving, the First Amendment to its 2010 Short Term Open Access Regulations. It is not the amendment text itself: the order records why the Commission pressed ahead and directs notification. Pages 1–2 set out the background: HPSEBL's petition for FY 2017-18 additional surcharge, its request that STOA consumers schedule at least 24 hours to stop frequent switching, and the FoR working-group/62nd-meeting endorsement. They also record the draft amendment notified on 14 March 2018 and published in the Rajpatra on 20 March 2018, newspaper notices on 24 March 2018, and stakeholder letters.
Pages 3–4 summarise the public hearing of 19 May 2018: IEX, STOA consumers such as Ambuja, ACC and Inox objected; HPSEBL, SLDC and HPPTCL supported the proposal, with HPSEBL wanting 24 hours and SLDC wanting 8 continuous hours.
Pages 4–13 are the Commission's issue-by-issue analysis. It rejects arguments that the draft is ultra vires s.42(2) or anti-competitive, finds the DISCOM's switching/gaming concern genuine, and relies on the distinction between normal demand diversity and STOA uncertainty. It retains the 8 continuous-hour uniform day-ahead schedule, not the 24 hours proposed by MoP/FoR and HPSEBL, while noting that a consumer may still avail STOA for less than 8 hours if the final schedule so provides, with possible higher additional surcharge. It treats the higher additional surcharge as only an enabling provision; the rate and methodology are left for a later determination. It clarifies that the amendment concerns day-ahead schedules submitted by consumers, not schedules approved by the authority. The only accepted textual change is replacing 'competent authority' with 'agency competent to finalize and approve the day ahead schedule' (p12). Paragraph 12 records the decision to retain the draft without other changes and approve it for notification (p12–13), signed at Shimla on 11 June 2018. Annexure A (p14) lists public-hearing participants.
Read with this
The regulation
- Dated 2 May 2010Short Term Open Access Regulations, 2010
Amendments and corrections
- Dated 11 Jun 2018Short Term Open Access Regulations, 2010 — First Amendment, 2018
- Dated 30 Aug 2024Short Term Open Access Regulations, 2010 — Second Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 25 Nov 2009Determination of Open Access Charges Order, 2009
- Dated 1 Dec 2011Determination of Open Access Charges Order, 2011
- Dated 26 Jun 2012Determination of Transmission and Tentative Wheeling Charges under Open Access Charges Order, 2012
- Dated 29 May 2013Determination of Transmission, Wheeling, SLDC and Cross Subsidy Surcharge under Open Access Charges Order, 2013
- Dated 29 Mar 2022Captive Generating Plant Status Verification Procedure, Himachal Pradesh, 2022
- Dated 29 Mar 2022Captive Generating Plant Status Verification Procedure, Himachal Pradesh
Earlier drafts
One more document belongs here and is not on Voltaic: a corrigendum.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.