HPERC · Himachal Pradesh Electricity Regulatory Commission
Determination of Transmission and Tentative Wheeling Charges under Open Access Charges Order, 2012
Himachal Pradesh Electricity Regulatory Commission (Determination of Transmission and tentative Wheeling Charges under Open Access Charges) Order, 2012
OrderDated 26 Jun 2012HPERC/418(V) dated 26 June, 2012
Made under the Short Term Open Access Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
HPERC issued this order on 26 June 2012 (p1) to fix what open access customers pay for using Himachal Pradesh's transmission and distribution systems during FY 2012-13. It is made under the Commission's own short-term and long-term/medium-term open access regulations and its transmission tariff regulations (p1), and it stays in force only until 31 March 2013 unless modified earlier or extended (p1).
Clause 3(A) determines transmission charges for the existing HPPTCL State Transmission System, split between short-term open access consumers — a per-unit charge built from HPPTCL's approved FY 2012-13 ARR and the estimated annual energy requirement at the State periphery (2.15 paise/kWh) — and long-term/medium-term consumers, charged per MW per month (Rs 11,157/MW/month) against an assumed 900 MW contracted capacity, adopted because HPPTCL and HPSEBL had no firm agreement on contracted capacity (p1–2). Charges are levied on energy/power injected into the State Transmission System, and recovery from the distribution licensee is capped at the approved ARR if contracted capacity varies (p2).
Clause 3(B) sets voltage-wise wheeling charges rather than a single average, on the Commission's view that per-unit wheeling cost at EHT and HT is materially below average. It apportions the Rs 1,026.01 crore wheeling cost allowed in the 24 April 2012 tariff order across EHT (66 kV and above), HT (11 kV and above) and LT (below 11 kV), yielding 47, 110 and 231 paise/unit respectively (p2–3). Charges are levied on energy drawn at the delivery point, and where injection and drawal voltages differ, the lower voltage level's rate applies (p3).
Clause 3(C) sets a flat SLDC/operating charge per transaction per day (Rs 2,000/day or part thereof), levied once even where both transmission and distribution systems are used; 3(D) requires open access consumers to absorb transmission and distribution losses in kind, credited to licensees through energy accounting (p3). Clause (F) leaves additional surcharge to be determined later only if a distribution licensee registers and substantiates a claim, and (G) leaves cross-subsidy surcharge to a separate order (p4).
Read with this
The regulation
- Dated 2 May 2010Short Term Open Access Regulations, 2010
Amendments and corrections
- Dated 11 Jun 2018Short Term Open Access Regulations, 2010 — First Amendment, 2018
- Dated 30 Aug 2024Short Term Open Access Regulations, 2010 — Second Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 25 Nov 2009Determination of Open Access Charges Order, 2009
- Dated 1 Dec 2011Determination of Open Access Charges Order, 2011
- Dated 29 May 2013Determination of Transmission, Wheeling, SLDC and Cross Subsidy Surcharge under Open Access Charges Order, 2013
- Dated 11 Jun 2018Short Term Open Access Regulations, 2010 — First Amendment, 2018 — Order
- Dated 29 Mar 2022Captive Generating Plant Status Verification Procedure, Himachal Pradesh, 2022
- Dated 29 Mar 2022Captive Generating Plant Status Verification Procedure, Himachal Pradesh
Earlier drafts
One more document belongs here and is not on Voltaic: a corrigendum.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.