Determination of Transmission and Tentative Wheeling Charges under Open Access Charges Order, 2012

Himachal Pradesh Electricity Regulatory Commission (Determination of Transmission and tentative Wheeling Charges under Open Access Charges) Order, 2012

OrderDated 26 Jun 2012HPERC/418(V) dated 26 June, 2012

Made under the Short Term Open Access Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HPERC issued this order on 26 June 2012 (p1) to fix what open access customers pay for using Himachal Pradesh's transmission and distribution systems during FY 2012-13. It is made under the Commission's own short-term and long-term/medium-term open access regulations and its transmission tariff regulations (p1), and it stays in force only until 31 March 2013 unless modified earlier or extended (p1).

Clause 3(A) determines transmission charges for the existing HPPTCL State Transmission System, split between short-term open access consumers — a per-unit charge built from HPPTCL's approved FY 2012-13 ARR and the estimated annual energy requirement at the State periphery (2.15 paise/kWh) — and long-term/medium-term consumers, charged per MW per month (Rs 11,157/MW/month) against an assumed 900 MW contracted capacity, adopted because HPPTCL and HPSEBL had no firm agreement on contracted capacity (p1–2). Charges are levied on energy/power injected into the State Transmission System, and recovery from the distribution licensee is capped at the approved ARR if contracted capacity varies (p2).

Clause 3(B) sets voltage-wise wheeling charges rather than a single average, on the Commission's view that per-unit wheeling cost at EHT and HT is materially below average. It apportions the Rs 1,026.01 crore wheeling cost allowed in the 24 April 2012 tariff order across EHT (66 kV and above), HT (11 kV and above) and LT (below 11 kV), yielding 47, 110 and 231 paise/unit respectively (p2–3). Charges are levied on energy drawn at the delivery point, and where injection and drawal voltages differ, the lower voltage level's rate applies (p3).

Clause 3(C) sets a flat SLDC/operating charge per transaction per day (Rs 2,000/day or part thereof), levied once even where both transmission and distribution systems are used; 3(D) requires open access consumers to absorb transmission and distribution losses in kind, credited to licensees through energy accounting (p3). Clause (F) leaves additional surcharge to be determined later only if a distribution licensee registers and substantiates a claim, and (G) leaves cross-subsidy surcharge to a separate order (p4).

Standard name
Open Access Regulations, Transmission Tariff Regulations
Primary topics
Open access charges, Transmission tariff, SLDC and RLDC fees and charges

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.