HPERC · Himachal Pradesh Electricity Regulatory Commission
Short Term Open Access (First Amendment) Regulations, 2018 — Draft
Himachal Pradesh Electricity Regulatory Commission (Short Term Open Access) (First Amendment) Regulations, 2018
Draft amendmentDated 14 Mar 2018No. HPERC/418 dated 14th March, 2018
Draft
A proposal that has since been finalised as the Short Term Open Access Regulations, 2010 — First Amendment, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
HPERC notification No. HPERC/418 dated 14 March 2018 (p1) publishes, for objections and suggestions, draft regulations that would make the first amendment to the Himachal Pradesh Electricity Regulatory Commission (Short Term Open Access) Regulations, 2010 (notified 2 June 2010). The recitals record HPSEBL's request — raised in petition No. 28/2017 on additional surcharge for FY 2017-18 and in its letters of 29.11.2017 and 08.01.2018 — that short term open access consumers be made to schedule power for at least 24 hours, citing a Ministry of Power consultation paper on open access and Forum of Regulators working-group recommendations against frequent switching (p1).
The draft itself (p2) runs to two clauses. Clause 1 gives the title and provides that the regulations take effect from publication in the Rajpatra, Himachal Pradesh. Clause 2 inserts three provisos at the end of Regulation 23 of the 2010 Regulations. For consumers of the distribution licensee, the first proviso restricts open access to a uniform quantum of power for a continuous 8 hours or more in a day and bars broken periods or varying quantum. The second makes a consumer whose approved day-ahead schedule does not fully meet those conditions liable to a higher additional surcharge and/or other charges, as the Commission may determine from time to time. The third disapplies the conditions on days the distribution licensee states in advance, by press notice or otherwise, that it cannot meet the consumer's requirement because of constraints such as power shortage.
Objections must reach the Secretary within twenty-one days of the notification (pp1–2), and the draft is also posted on the Commission's website (p2).
Read with this
The regulation
- Dated 2 May 2010Short Term Open Access Regulations, 2010
Amendments and corrections
- Dated 11 Jun 2018Short Term Open Access Regulations, 2010 — First Amendment, 2018
- Dated 30 Aug 2024Short Term Open Access Regulations, 2010 — Second Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 25 Nov 2009Determination of Open Access Charges Order, 2009
- Dated 1 Dec 2011Determination of Open Access Charges Order, 2011
- Dated 26 Jun 2012Determination of Transmission and Tentative Wheeling Charges under Open Access Charges Order, 2012
- Dated 29 May 2013Determination of Transmission, Wheeling, SLDC and Cross Subsidy Surcharge under Open Access Charges Order, 2013
- Dated 11 Jun 2018Short Term Open Access Regulations, 2010 — First Amendment, 2018 — Order
- Dated 29 Mar 2022Captive Generating Plant Status Verification Procedure, Himachal Pradesh, 2022
- Dated 29 Mar 2022Captive Generating Plant Status Verification Procedure, Himachal Pradesh
Earlier drafts
One more document belongs here and is not on Voltaic: a corrigendum.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.