Determination of Transmission, Wheeling, SLDC and Cross Subsidy Surcharge under Open Access Charges Order, 2013

Himachal Pradesh Electricity Regulatory Commission (Determination of Transmission Charges, Wheeling Charges, SLDC Charges and Cross Subsidy Surcharge under Open Access Charges) Order, 2013

OrderDated 29 May 2013In force from 1 Apr 2013No. HPERC/418(V).- dated 29 May, 2013

Made under the Short Term Open Access Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is HPERC's annual order fixing the charges an open-access consumer in Himachal Pradesh pays for using the State's transmission and distribution networks and SLDC services during FY 2013-14. It is dated 29 May 2013 but takes effect retrospectively from 1 April 2013 and runs to 31 March 2014 unless modified or extended (p1).

Paragraph 3 sets out the charge heads: transmission charges to the STU/transmission licensee (HPPTCL), wheeling charges to the distribution licensee (HPSEBL), operating charges to the SLDC (HPLDS), plus additional surcharge and cross subsidy surcharge under section 42 of the Act (p1).

Part A computes transmission charges two ways off HPPTCL's approved FY14 ARR — a per-unit rate for short-term consumers spread over energy routed on the HPPTCL network, and a per-MW-per-month rate for long- and medium-term consumers spread over an assumed average power flow, the Commission noting it had no reliable data and that the 560 MW contracted in the TSA was insufficient (p2–3). Notes fix the levy point at injection into the State transmission system, cap recovery from the distribution licensee at approved ARR, base recovery from open-access consumers on contracted capacity, and carry any true-up shortfall or surplus into the next MYT (p3).

Part B apportions HPSEBL's wheeling business cost across EHT, HT and LT voltage classes to derive per-unit wheeling rates, levies them on energy drawn at the delivery point, and applies the rate of the lower voltage level where injection and drawal voltages differ (p3–4). Part C sets a flat per-day SLDC operating charge per transaction, levied only once even where both transmission and distribution systems are used (p4). Part D defers additional surcharge to a determination made only if the distribution licensee registers and substantiates a claim (p4).

Part E works the cross subsidy surcharge off the National Tariff Policy formula, giving category-wise rates for consumers taking open access for the full day and the entire requirement, and a separate peak/off-peak schedule for partial-hour open access; it also exempts energy that the distribution licensee has in advance said it cannot supply (p4–6). Part F requires open-access consumers to absorb transmission and distribution losses in kind, credited to the respective licensees (p6).

Standard name
Open Access Regulations, Transmission Tariff Regulations
Primary topics
Open access charges, Transmission tariff, Wheeling and retail supply tariff

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document