Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Captive Generating Plant Status Verification Procedure, Himachal Pradesh

Procedure for Verification of Status of Captive Generating Plant in the State of Himachal Pradesh.

ProcedureDated 29 Mar 2022In force from 1 Apr 2022

Made under the Short Term Open Access Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Annexure-A sets out HPERC's procedure for deciding whether a generating plant in Himachal Pradesh qualifies as a captive generating plant, and therefore whether its users avoid cross-subsidy and additional surcharge on open-access/wheeling. It commences at 00:00 hrs on 1 April 2022 (p1).

After definitions (p1–2), it reproduces the statutory test: Section 9 of the Electricity Act 2003 and Rule 3 of the Electricity Rules 2005, including the ownership and annual consumption requirements (p3–4). Paragraph 4 then restates how those tests apply to single captive users, associations of persons, cooperative societies, partnerships/LLPs and SPVs, with a shareholding-change illustration (p5–6). Paragraph 5 designates the State Load Despatch Centre as Verifying Authority and sets its powers to call for clarifications, determine status by 31 July of the assessment year, report to the distribution licensee and the Commission within 15 days, and approach the Commission for adjudication (p6–7).

Paragraph 6 lists the documents needed for captive wheeling approval and annual verification, including CA/CMA/CS ownership certificates, consumption data and constitutional documents, generally within 60 days of the financial-year close (p8–9). Paragraph 7 explains how 51% consumption is verified, including treatment of auxiliary consumption, absence of metering, monthly data submission and forced outages, and the first-year annual basis (p9–10). Paragraphs 8–9 cover ceasing of captive status, resulting surcharge liability, and metering/communication requirements (p11). Paragraph 10 sets payment options for cross-subsidy/additional surcharge, payment security, dispute timelines and refunds; Paragraph 11 covers default and disconnection (p12–13). Formats I–VII provide the certificate and data templates (p14–27).

Standard name
Captive Generation Regulations
Primary topics
Captive status, Open access, Open access charges

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.