HPERC · Himachal Pradesh Electricity Regulatory Commission
Captive Generating Plant Status Verification Procedure, Himachal Pradesh
Procedure for Verification of Status of Captive Generating Plant in the State of Himachal Pradesh.
ProcedureDated 29 Mar 2022In force from 1 Apr 2022
Made under the Short Term Open Access Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Annexure-A sets out HPERC's procedure for deciding whether a generating plant in Himachal Pradesh qualifies as a captive generating plant, and therefore whether its users avoid cross-subsidy and additional surcharge on open-access/wheeling. It commences at 00:00 hrs on 1 April 2022 (p1).
After definitions (p1–2), it reproduces the statutory test: Section 9 of the Electricity Act 2003 and Rule 3 of the Electricity Rules 2005, including the ownership and annual consumption requirements (p3–4). Paragraph 4 then restates how those tests apply to single captive users, associations of persons, cooperative societies, partnerships/LLPs and SPVs, with a shareholding-change illustration (p5–6). Paragraph 5 designates the State Load Despatch Centre as Verifying Authority and sets its powers to call for clarifications, determine status by 31 July of the assessment year, report to the distribution licensee and the Commission within 15 days, and approach the Commission for adjudication (p6–7).
Paragraph 6 lists the documents needed for captive wheeling approval and annual verification, including CA/CMA/CS ownership certificates, consumption data and constitutional documents, generally within 60 days of the financial-year close (p8–9). Paragraph 7 explains how 51% consumption is verified, including treatment of auxiliary consumption, absence of metering, monthly data submission and forced outages, and the first-year annual basis (p9–10). Paragraphs 8–9 cover ceasing of captive status, resulting surcharge liability, and metering/communication requirements (p11). Paragraph 10 sets payment options for cross-subsidy/additional surcharge, payment security, dispute timelines and refunds; Paragraph 11 covers default and disconnection (p12–13). Formats I–VII provide the certificate and data templates (p14–27).
Read with this
The regulation
- Dated 2 May 2010Short Term Open Access Regulations, 2010
Amendments and corrections
- Dated 11 Jun 2018Short Term Open Access Regulations, 2010 — First Amendment, 2018
- Dated 30 Aug 2024Short Term Open Access Regulations, 2010 — Second Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 25 Nov 2009Determination of Open Access Charges Order, 2009
- Dated 1 Dec 2011Determination of Open Access Charges Order, 2011
- Dated 26 Jun 2012Determination of Transmission and Tentative Wheeling Charges under Open Access Charges Order, 2012
- Dated 29 May 2013Determination of Transmission, Wheeling, SLDC and Cross Subsidy Surcharge under Open Access Charges Order, 2013
- Dated 11 Jun 2018Short Term Open Access Regulations, 2010 — First Amendment, 2018 — Order
- Dated 29 Mar 2022Captive Generating Plant Status Verification Procedure, Himachal Pradesh, 2022
Earlier drafts
One more document belongs here and is not on Voltaic: a corrigendum.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.