HPERC · Himachal Pradesh Electricity Regulatory Commission

Determination of Open Access Charges Order, 2009

Himachal Pradesh Electricity Regulatory Commission (Determination of Open Access Charges) Order, 2009

OrderDated 25 Nov 2009No. HPERC/418.- dated 25th November, 2009

Made under the Short Term Open Access Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page order of the Himachal Pradesh Electricity Regulatory Commission, dated 25 November 2009, fixing what an open access customer must pay to use the State's transmission and distribution networks (p1). It is made under the Commission's Open Access Regulations 2005 (regs 15 and 33), the Transmission Tariff Determination Regulations 2007 (reg 32) and the Cross Subsidy Surcharge Regulations 2006 (reg 3), and comes into force on publication in the Rajpatra, Himachal Pradesh — no Gazette date is printed (p1).

Clause 1 gives the short title and commencement. Clause 2 is the sunset clause: the order runs only to 31 March 2011 unless the Commission orders its continuation, with or without variations (p1).

Clause 3 is the operative part, split by where the customer sits. For open access customers in transmission it sets a transmission charge of Rs. 43358.92/MW/month and an SLDC/operating charge of Rs. 1,000/- per day or part of a day for each transaction (p1). For open access customers in distribution it sets wheeling charges of 71 paise/unit — expressly adopting the rate already determined in the FY 2009-2010 tariff order for the Himachal Pradesh State Electricity Board — the same per-transaction SLDC charge, and category-wise cross-subsidy surcharges that are positive for the LS EHT category and Nil for the LS HT and BS HT categories (p1–2).

The order is signed by the Secretary by order of the Commission (p2).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, SLDC and RLDC fees and charges

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document