HPERC · Himachal Pradesh Electricity Regulatory Commission
Determination of Open Access Charges Order, 2011
Himachal Pradesh Electricity Regulatory Commission (Determination of Open Access Charges) Order, 2011
OrderDated 1 Dec 2011No. HPERC/418 dated 1 st December, 2011
Made under the Short Term Open Access Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-season tariff order of the Himachal Pradesh Electricity Regulatory Commission, issued 1 December 2011 under the State's short-term and long-term/medium-term open access regulations, the transmission tariff regulations and the cross-subsidy regulations (p1). It determines the basket of charges an open access customer in Himachal Pradesh pays and, by its own terms, stays in force only up to 31 March 2012 unless the Commission extends it (p1).
Part 3(A) fixes transmission charges for use of HPPTCL's existing transmission system, computed from the separate HPPTCL ARR approved for 2011-12, with one method for short-term users and another for long-term and medium-term users; because HPPTCL and HPSEBL had no firm agreement on contracted capacity, the Commission assumed a capacity figure for the long/medium-term rate (p1–2). Charges under both are levied on energy or power injected into the State transmission system, and recovery from a distribution licensee through transmission charges is capped at the approved ARR (p2).
Part 3(B) sets voltage-wise wheeling charges — EHT, HT and below 11 kV — after apportioning the wheeling cost determined in the July 2011 tariff order across voltage classes, with cost brought forward from the next higher voltage block; wheeling is levied on energy drawn at the delivery point, and where injection and draw voltages differ, the lower voltage level's rate applies (p2–3). Part 3(C) sets a per-day SLDC/operating charge per transaction, levied once even where both transmission and distribution systems are used (p3). Part 3(D) applies the National Tariff Policy cross-subsidy formula, defines its terms, and gives surcharges by consumer category split between peak and off-peak hours (p3–4). Part 3(E) requires open access consumers to absorb transmission and distribution losses in kind, credited through energy accounting (p4). Part 3(F) leaves additional surcharge to be determined later only if the distribution licensee registers and substantiates a claim (p4–5).
Read with this
The regulation
- Dated 2 May 2010Short Term Open Access Regulations, 2010
Amendments and corrections
- Dated 11 Jun 2018Short Term Open Access Regulations, 2010 — First Amendment, 2018
- Dated 30 Aug 2024Short Term Open Access Regulations, 2010 — Second Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 25 Nov 2009Determination of Open Access Charges Order, 2009
- Dated 26 Jun 2012Determination of Transmission and Tentative Wheeling Charges under Open Access Charges Order, 2012
- Dated 29 May 2013Determination of Transmission, Wheeling, SLDC and Cross Subsidy Surcharge under Open Access Charges Order, 2013
- Dated 11 Jun 2018Short Term Open Access Regulations, 2010 — First Amendment, 2018 — Order
- Dated 29 Mar 2022Captive Generating Plant Status Verification Procedure, Himachal Pradesh, 2022
- Dated 29 Mar 2022Captive Generating Plant Status Verification Procedure, Himachal Pradesh
Earlier drafts
One more document belongs here and is not on Voltaic: a corrigendum.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.