In the matter of finalization of the Himachal Pradesh Electricity Regulatory Commission (Short Term Open Access) (Second Amendment) Regulations, 2024
OrderDated 30 Aug 2024
Read with the Short Term Open Access Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This order finalizes the second amendment to Himachal Pradesh's Short Term Open Access Regulations. It records that HPERC notified the principal STOA Regulations in 2010 (Rajpatra, 3 June 2010) and a first amendment in 2018, and that the non-refundable STOA application fee and the operating charges — including the fee for scheduling system operation and for collection and disbursement of charges — had not been revised since then (p1). HPSLDC had repeatedly asked the Commission to revisit them so it could run the system efficiently.
The Commission published a draft Second Amendment on 8 July 2024 in the Rajpatra under s.181(1) of the Electricity Act, 2003, publicised it in The Tribune and Dainik Bhaskar on 11 July 2024, posted the full text on its website, and wrote to major stakeholders on 29.07.2024 seeking objections by 07.08.2024 (p1). Only HPSLDC responded; it proposed widening the definition of 'applicant' in Regulation 2(2) to cover applicants for short-term GNA contracts, which the Commission examined and rejected as unnecessary because the existing provisions are sufficient (p2). A public hearing on 16.08.2024 was attended by HPSEBL and SLDC representatives, and the proposed amendments were not opposed (p2–3).
Since no stakeholder objections to draft amendments of Regulations 6 and 26 were received, the Commission finalized and approved the draft amendment Regulations as published and directed that they be notified accordingly (p2). Annexure A lists the public hearing participants (p3). The order does not set out the amended text or the revised fee and charge levels; it is a finalisation and reasoning document, and the amendments take effect on the final notification, whose date is not given.
Read with this
The regulation
- Dated 2 May 2010Short Term Open Access Regulations, 2010
Amendments and corrections
- Dated 11 Jun 2018Short Term Open Access Regulations, 2010 — First Amendment, 2018
- Dated 30 Aug 2024Short Term Open Access Regulations, 2010 — Second Amendment, 2024
Procedures and orders made under it
- Dated 25 Nov 2009Determination of Open Access Charges Order, 2009
- Dated 1 Dec 2011Determination of Open Access Charges Order, 2011
- Dated 26 Jun 2012Determination of Transmission and Tentative Wheeling Charges under Open Access Charges Order, 2012
- Dated 29 May 2013Determination of Transmission, Wheeling, SLDC and Cross Subsidy Surcharge under Open Access Charges Order, 2013
- Dated 11 Jun 2018Short Term Open Access Regulations, 2010 — First Amendment, 2018 — Order
- Dated 29 Mar 2022Captive Generating Plant Status Verification Procedure, Himachal Pradesh, 2022
- Dated 29 Mar 2022Captive Generating Plant Status Verification Procedure, Himachal Pradesh
Earlier drafts
One more document belongs here and is not on Voltaic: a corrigendum.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.