HPERC · Himachal Pradesh Electricity Regulatory Commission
Captive Generating Plant Status Verification Procedure, Himachal Pradesh, 2022
Procedure for Verification of the status of Captive Generating Plant (CGP) in the State of Himachal Pradesh.
OrderDated 29 Mar 2022In force from 1 Apr 2022
Made under the Short Term Open Access Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Himachal Pradesh Electricity Regulatory Commission's order finalising a procedure for verifying whether a power plant qualifies as a Captive Generating Plant (CGP), with the substantive Procedure annexed as Annexure – A and coming into force from 00.00 hrs on 1 April 2022 (p18). The order states the need: neither the Electricity Act 2003, the Electricity Rules 2005, nor the Commission's own regulations provide a verification mechanism, so the Commission framed one under s.181(1) read with s.9 of the Act and Rule 3 of the Rules, alongside its open-access and conduct-of-business regulations (pp1–2). A draft was notified on 24 August 2021, published in two newspapers on 5 September 2021, circulated to major stakeholders on 7 September 2021, and discussed at a video-conference public hearing on 30 September 2021 (pp2–3).
The core of the document is issue-by-issue reasoning (pp3–17). The Commission rules on when unit-wise identification must be furnished; aligns verification to the annual, end-of-financial-year basis under Rule 3; treats SPVs and associations of persons separately following Rule 3(1)(b) and the second proviso to Rule 3(1)(a); and designates the Himachal Pradesh State Load Despatch Centre as Verifying Authority, rejecting proposals to use the Chief Electrical Inspector or an independent committee (pp5–6). It defines the consequences of ceasing to qualify, including liability to cross subsidy surcharge and/or additional surcharge, with a carve-in for certified forced outages (p7). It creates a 45-day route to the Commission by petition against the Verifying Authority's determination, with protection from surcharge recovery during the window and any adjudication (pp7–8). It settles the monthly-vs-annual surcharge question: annual verification, but the applicant for captive open access may pay monthly or furnish a bank guarantee/letter of credit/fixed deposit, with refund or return within 30 days and 12% simple interest for delay (pp9–10). It rules on data timelines and formats, on gross-minus-auxiliary accounting of generation with use of normative auxiliary consumption and losses where metered data is absent, on accepting chartered accountant certification of shareholding, and on retaining monthly data submission for record only (pp10–16). Finally it adopts the APTEL Tamil Nadu Power Producers logic on end-of-year shareholding and change in ownership structure (pp16–17).
Read with this
The regulation
- Dated 2 May 2010Short Term Open Access Regulations, 2010
Amendments and corrections
- Dated 11 Jun 2018Short Term Open Access Regulations, 2010 — First Amendment, 2018
- Dated 30 Aug 2024Short Term Open Access Regulations, 2010 — Second Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 25 Nov 2009Determination of Open Access Charges Order, 2009
- Dated 1 Dec 2011Determination of Open Access Charges Order, 2011
- Dated 26 Jun 2012Determination of Transmission and Tentative Wheeling Charges under Open Access Charges Order, 2012
- Dated 29 May 2013Determination of Transmission, Wheeling, SLDC and Cross Subsidy Surcharge under Open Access Charges Order, 2013
- Dated 11 Jun 2018Short Term Open Access Regulations, 2010 — First Amendment, 2018 — Order
- Dated 29 Mar 2022Captive Generating Plant Status Verification Procedure, Himachal Pradesh
Earlier drafts
One more document belongs here and is not on Voltaic: a corrigendum.
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.