MERC · Maharashtra Electricity Regulatory Commission

Explanatory Memorandum on Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality (First Amendment) Regulations, 2024

EXPLANATORY MEMORANDUM ON MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (ELECTRICITY SUPPLY CODE AND STANDARDS OF PERFORMANCE OF DISTRIBUTION LICENSEES INCLUDING POWER QUALITY) (FIRST AMENDMENT) REGULATIONS, 2024

Explanatory memorandum to a draftReleased with the notice dated 23 May 2024

Explanatory memorandum to the Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality, 2021 — First Amendment, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MERC's Explanatory Memorandum for the draft First Amendment (2024) to its Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2021 (p1, p3). Its reason for existing is the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 and their four amendment rounds, plus MoP's letter of 13 September 2022 telling State Commissions that the Rules prevail over inconsistent regulations and that regulations must be aligned to them (p3, p5).

Chapter 1 (pp3–5) sets out the background: the statutory mandate under sections 181(2)(x), 50 and 57 of the Electricity Act 2003, the 2021 Supply Code, the successive MoP amendment Rules, and the four subject areas identified as needing change — new definitions, replacement of defective/burnt meters, reliability of supply, and revised connection-release timelines. It states the balancing intent between consumers and distribution licensees and notes that unchanged clauses are not discussed.

Chapter 2 (pp5–14) is the substance. It walks through each targeted regulation of the 2021 Code, quotes the existing text, explains the gap against the MoP Rules, and then prints the proposed substituted or inserted clause. The proposals cover: new definitions of CAIFI and MAIFI (p7); substitution of the second proviso to Regulation 5.8 so connection-release timelines follow the 2024 Rules, with augmentation and new-substation cases on a single consolidated timeline (pp7–8); extension of the burnt-meter provisions of Regulations 15.3.3 and 15.3.4 to defective meters (pp9–10); a new obligation to read pre-payment meters periodically and give consumers consumption and balance data (pp10–11); new timelines for testing meters on complaint, with an additional verification meter (p11); publication of the list of NABL-accredited test laboratories (pp11–12); a 24x7 supply obligation with a carve-out for categories such as agriculture (pp12–13); addition of CAIFI and MAIFI to the reliability indices in Regulation 22.12.1 (p13); and a mechanism for monitoring and restoring outages (pp13–14).

The memorandum closes with the amendment to Annexure-II, the compensation table for failure to meet standards of performance, realigning compensation for connection-release delays with the revised timelines (p14).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Standards of performance, Metering, New connections and load changes

Read with this

Other copies of these documents (1)

3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it not held as English text.

Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document