MERC · Maharashtra Electricity Regulatory Commission
Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality, 2021 — First Amendment, 2024 — Draft
Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) (First Amendment) Regulations, 2024
Draft amendmentReleased with the notice dated 23 May 2024
Draft
A proposal that has since been finalised as the Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2021 — First Amendment, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft MERC notification that would amend the Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021, referred to throughout as 'the Principal Regulations'. It is issued as a draft: the notification number, the date and the compensation figures in the Annexure-II table are left blank (p1, p4).
Page 1 sets out the Electricity Act 2003 enabling provisions, gives the short title — the (First Amendment) Regulations, 2024 — and ties commencement to publication in the Official Gazette. It then amends Regulation 2 of the Principal Regulations by inserting two definitions: CAIFI (Customer Average Interruption Frequency Index) and MAIFI (Momentary Average Interruption Frequency Index), each left to be 'as specified by the Commission' (p1).
Page 2 rewrites the second proviso to Regulation 5.8, fixing outer time limits for releasing a new connection or modifying an existing one, graded by area type, with a longer limit where augmentation of the distribution mains or a new sub-station is needed. A new Regulation 5.9 requires the licensee, on a consumer's request, to give a separate connection for EV charging, on the Regulation 5.8 timeline. The page also substitutes Regulation 15.3.3 (burnt or defective meters — replacement, recovery of meter price where the consumer is at fault, and billing for the unmetered period) and, on p3, Regulation 15.3.4 (bar on recovering meter price except for burnt, defective or lost meters).
Page 3 covers metering and supply standards: prepayment meters read at least quarterly with consumption data pushed to consumers and daily access for smart prepayment meters (15.4.4); meter testing within thirty days of complaint and an additional meter within five days for a three-month verification (15.6.1(A)); publication of the NABL-accredited laboratory list at offices and on the website (15.6.2); a new 24x7 supply obligation with a proviso allowing the Commission to prescribe lower supply hours for categories such as agriculture (22.1(A)); and the addition of CAIFI and MAIFI to the indices in Regulation 22.12.1.
Page 4 adds Regulation 28.9, requiring a mechanism — preferably automated — for monitoring and restoring outages, and substitutes Sr. No. 1(ii) of Annexure-II, the compensation payable when connection timelines are missed (p4).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 1 Mar 2021Practice Directions under Supply Code and Standards of Performance Regulations, 2021
- Dated 26 May 2021Revision of Contract Demand in a Billing Cycle — Practice Direction, 2021
- Dated 26 Dec 2023Practice Directions under the Electricity Supply Code and Standards of Performance Regulations, 2021 — disclaimers on new-connection applications and electricity bills, 2023
- Dated 22 Jul 2024Practice Directions under the Electricity Supply Code and Standards of Performance Regulations, 2021 — 2024
Other copies of these documents (1)
Earlier drafts
- Released with the notice dated 23 May 2024Explanatory memorandum: Explanatory Memorandum on Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality (First Amendment) Regulations, 2024
3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it not held as English text.
Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.