Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality, 2021 — First Amendment, 2024 — Draft

Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) (First Amendment) Regulations, 2024

Draft amendmentReleased with the notice dated 23 May 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft MERC notification that would amend the Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021, referred to throughout as 'the Principal Regulations'. It is issued as a draft: the notification number, the date and the compensation figures in the Annexure-II table are left blank (p1, p4).

Page 1 sets out the Electricity Act 2003 enabling provisions, gives the short title — the (First Amendment) Regulations, 2024 — and ties commencement to publication in the Official Gazette. It then amends Regulation 2 of the Principal Regulations by inserting two definitions: CAIFI (Customer Average Interruption Frequency Index) and MAIFI (Momentary Average Interruption Frequency Index), each left to be 'as specified by the Commission' (p1).

Page 2 rewrites the second proviso to Regulation 5.8, fixing outer time limits for releasing a new connection or modifying an existing one, graded by area type, with a longer limit where augmentation of the distribution mains or a new sub-station is needed. A new Regulation 5.9 requires the licensee, on a consumer's request, to give a separate connection for EV charging, on the Regulation 5.8 timeline. The page also substitutes Regulation 15.3.3 (burnt or defective meters — replacement, recovery of meter price where the consumer is at fault, and billing for the unmetered period) and, on p3, Regulation 15.3.4 (bar on recovering meter price except for burnt, defective or lost meters).

Page 3 covers metering and supply standards: prepayment meters read at least quarterly with consumption data pushed to consumers and daily access for smart prepayment meters (15.4.4); meter testing within thirty days of complaint and an additional meter within five days for a three-month verification (15.6.1(A)); publication of the NABL-accredited laboratory list at offices and on the website (15.6.2); a new 24x7 supply obligation with a proviso allowing the Commission to prescribe lower supply hours for categories such as agriculture (22.1(A)); and the addition of CAIFI and MAIFI to the indices in Regulation 22.12.1.

Page 4 adds Regulation 28.9, requiring a mechanism — preferably automated — for monitoring and restoring outages, and substitutes Sr. No. 1(ii) of Annexure-II, the compensation payable when connection timelines are missed (p4).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Standards of performance, New connections and load changes, Metering

Read with this

Other copies of these documents (1)

3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it not held as English text.

Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.