KERC · Karnataka Electricity Regulatory Commission
Procurement of Energy from Renewable Sources Regulations, 2011 — Fourth Amendment, 2016
Karnataka Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (Fourth Amendment) Regulations, 2016
AmendmentDated 21 Feb 2017Published in the Gazette 22 Feb 2017No. Y/03/16/ 2641 dated 21.02.2017
Amends the Procurement of Energy from Renewable Sources Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-page Karnataka Gazette notification carrying the Fourth Amendment to KERC's renewable purchase obligation (RPO) regulations. Issued by the Karnataka Electricity Regulatory Commission on 21 February 2017 and gazetted on 22 February 2017 (p1), it comes into force from financial year 2016-17 (p1).
The preamble records that a draft was published for stakeholder comments and a public hearing was held on 25 January 2017, and states the enabling powers under the Electricity Act, 2003 (p1).
Regulation 1 gives the title, extends the regulations to the whole of Karnataka and fixes commencement (p1). Regulation 2 substitutes a wholly new Regulation 5 in the KERC (Procurement of Energy from Renewable Sources) Regulations, 2011 (p1–2).
The substituted Regulation 5 sets out the alternative modes of RPO compliance. It identifies the obligated entities — Distribution Licensees, Captive Consumers and Open Access Consumers specified in Regulation 3 — and permits them to meet their RPO, partly or entirely, either by purchasing renewable energy certificates (RECs) or by consuming electricity from their own renewable energy plant, grid-connected or otherwise (p2). Solar is carved out: the solar RPO must be met through solar RECs or an own solar plant. The self-consumption route is conditioned on a minimum owned plant capacity, metering and communication arrangements with the SLDC for monitoring, and a bar on claiming RECs for the self-consumed quantum. SLDC must publish a detailed metering, communication, reporting and monitoring procedure within 30 days of notification (p2).
Read with this
The regulation
- Dated 16 Mar 2011Procurement of Energy from Renewable Sources Regulations, 2011
Amendments and corrections
- Dated 20 Dec 2011Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2011
- Dated 14 Sep 2012Procurement of Energy from Renewable Sources Regulations, 2011 — Second Amendment, 2012
- Dated 16 Nov 2015Procurement of Energy from Renewable Sources Regulations, 2011 — Third Amendment, 2015
- Dated 15 Feb 2018Procurement of Energy from Renewable Sources (Fifth Amendment) Regulations, 2017
- Dated 15 Nov 2018Procurement of Energy from Renewable Sources Regulations, 2011 — Sixth Amendment, 2018
- Dated 19 Nov 2019Procurement of Energy from Renewable Sources Regulations, 2011 — Seventh Amendment, 2019
- Dated 12 Jul 2022Procurement of Energy from Renewable Sources (Eighth Amendment) Regulations, 2022
- Dated 25 Nov 2022Procurement of Energy from Renewable Sources Regulations, 2011 — Ninth Amendment, 2022
- Dated 19 Jun 2024Procurement of Energy from Renewable Sources (Tenth Amendment) Regulations, 2024
- Dated 21 Jan 2025Procurement of Energy from Renewable Sources Regulations, 2011 — Eleventh Amendment, 2025
Procedures and orders made under it
- Dated 1 Feb 2012Average Pooled Cost for FY 2012 — Notification
- Dated 21 Jun 2013Average Pooled Cost for FY 2012-2013
- Dated 21 Apr 2014Average Pooled Cost for FY 2014-2015
- Dated 30 Jun 2014Average Pooled Cost for FY 2014-2015
- Dated 31 Mar 2016Truing up of APPC for FY2015-16 and provisional APPC for FY2016-17
- Dated 30 Mar 2017Truing up of APPC for FY 2016-17 and provisional APPC for FY 2017-18
- Dated 2 Apr 2018Truing up of APPC for FY 2017-18 and provisional APPC for FY 2018-19, 2018
- Dated 5 Mar 2019APPC Truing Up for FY 2018-19 and Provisional APPC for FY 2019-20 — Notification
- Dated 19 Mar 2020Truing up of APPC for FY 2019-20 and notifying provisional APPC for FY 2020-21
- Dated 23 Apr 2021Truing up of APPC for FY2020-21 and Provisional APPC for FY2021-22 — Notification
- Dated 28 Mar 2023Truing up of APPC for FY 2022-23 and Provisional APPC for FY 2023-24 — Notification
- Dated 1 Apr 2023Truing up of APPC for FY 2023-24 and Provisional APPC for FY 2024-25 — Notification
- Dated 25 Mar 2024APPC True-up for FY 2023-24 and Provisional APPC for FY 2024-25 Order, 2024
- Dated 10 Apr 2026Truing up of APPC for FY 2025-26 and Provisional APPC for FY 2026-27
Earlier drafts
5 more documents belong here and are not on Voltaic: 5 copies in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.