Procurement of Energy from Renewable Sources Regulations, 2011 — Eleventh Amendment, 2025

Karnataka Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (Eleventh Amendment) Regulations, 2025

AmendmentDated 21 Jan 2025KERC/SC(F)/RPO/2024/1358 dated 21/01/2025

Amends the Procurement of Energy from Renewable Sources Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The bulk of this document is the Eleventh Amendment to KERC's 2011 renewable purchase obligation (RPO) regulations, issued as Notification No. KERC/SC(F)/RPO/2024/1358 dated 21/01/2025 (p1). The Commission explains that its eighth amendment had fixed an RPO trajectory only up to 2024-25, and that the Centre's notification S.O. 4617(E) dated 20-10-2023 under the Energy Conservation Act 2001 — in force from 1 April 2024 — prescribes minimum shares of non-fossil consumption for designated consumers from 2024-25 to 2029-30 (p1). Before amending, KERC used its difficulty-removal power to issue an order dated 8-10-2024 fixing the 2024-25 target, then consulted: a draft amendment was published with comments open till 27-11-2024 and a public hearing was held on 30-12-2024 after newspaper notices on 17-12-2024 (pp1–2).

Regulation 1 gives the title, extends the amendment to the whole State and brings it into force at once; Regulation 2 substitutes clauses 4(i), 4(ii) and 4(iii) of the 2011 Regulations (p2). The substituted text, set out as an existing-versus-amended table, replaces the earlier percentage-based RPO with the Centre's trajectory, split each year into wind, hydro and further renewable sub-components against a total RE figure, and then applies that same trajectory in turn to distribution licensees/ESCOMs area-wise, to grid-connected captive consumers, and to open access consumers (pp2, 4–6). Two provisos preserve the pre-2022-23 regime under the REC Framework Regulations and allow a single legal entity with units at several locations in Karnataka to be assessed on its combined RPO (p6). Fragments survive of an explanation about excluding hydro power from total renewable energy consumption (p4).

Appended to the same file is a separate and quite different instrument — the KERC (Implementation of rooftop aero turbine with solar or without solar) Regulations, 2025, No. KERC/S/F-31/Vol-1401/1351 dated 20.01.2025 — of which only the opening preamble reference to sections 86(1)(e) and 61(h) of the Act is present (p6).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document