The bulk of this document is the Eleventh Amendment to KERC's 2011 renewable purchase obligation (RPO) regulations, issued as Notification No. KERC/SC(F)/RPO/2024/1358 dated 21/01/2025 (p1). The Commission explains that its eighth amendment had fixed an RPO trajectory only up to 2024-25, and that the Centre's notification S.O. 4617(E) dated 20-10-2023 under the Energy Conservation Act 2001 — in force from 1 April 2024 — prescribes minimum shares of non-fossil consumption for designated consumers from 2024-25 to 2029-30 (p1). Before amending, KERC used its difficulty-removal power to issue an order dated 8-10-2024 fixing the 2024-25 target, then consulted: a draft amendment was published with comments open till 27-11-2024 and a public hearing was held on 30-12-2024 after newspaper notices on 17-12-2024 (pp1–2).
Regulation 1 gives the title, extends the amendment to the whole State and brings it into force at once; Regulation 2 substitutes clauses 4(i), 4(ii) and 4(iii) of the 2011 Regulations (p2). The substituted text, set out as an existing-versus-amended table, replaces the earlier percentage-based RPO with the Centre's trajectory, split each year into wind, hydro and further renewable sub-components against a total RE figure, and then applies that same trajectory in turn to distribution licensees/ESCOMs area-wise, to grid-connected captive consumers, and to open access consumers (pp2, 4–6). Two provisos preserve the pre-2022-23 regime under the REC Framework Regulations and allow a single legal entity with units at several locations in Karnataka to be assessed on its combined RPO (p6). Fragments survive of an explanation about excluding hydro power from total renewable energy consumption (p4).
Appended to the same file is a separate and quite different instrument — the KERC (Implementation of rooftop aero turbine with solar or without solar) Regulations, 2025, No. KERC/S/F-31/Vol-1401/1351 dated 20.01.2025 — of which only the opening preamble reference to sections 86(1)(e) and 61(h) of the Act is present (p6).
Read with this
The regulation
- Dated 16 Mar 2011Procurement of Energy from Renewable Sources Regulations, 2011
Amendments and corrections
- Dated 20 Dec 2011Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2011
- Dated 14 Sep 2012Procurement of Energy from Renewable Sources Regulations, 2011 — Second Amendment, 2012
- Dated 16 Nov 2015Procurement of Energy from Renewable Sources Regulations, 2011 — Third Amendment, 2015
- Dated 21 Feb 2017Procurement of Energy from Renewable Sources Regulations, 2011 — Fourth Amendment, 2016
- Dated 15 Feb 2018Procurement of Energy from Renewable Sources (Fifth Amendment) Regulations, 2017
- Dated 15 Nov 2018Procurement of Energy from Renewable Sources Regulations, 2011 — Sixth Amendment, 2018
- Dated 19 Nov 2019Procurement of Energy from Renewable Sources Regulations, 2011 — Seventh Amendment, 2019
- Dated 12 Jul 2022Procurement of Energy from Renewable Sources (Eighth Amendment) Regulations, 2022
- Dated 25 Nov 2022Procurement of Energy from Renewable Sources Regulations, 2011 — Ninth Amendment, 2022
- Dated 19 Jun 2024Procurement of Energy from Renewable Sources (Tenth Amendment) Regulations, 2024
Procedures and orders made under it
- Dated 1 Feb 2012Average Pooled Cost for FY 2012 — Notification
- Dated 21 Jun 2013Average Pooled Cost for FY 2012-2013
- Dated 21 Apr 2014Average Pooled Cost for FY 2014-2015
- Dated 30 Jun 2014Average Pooled Cost for FY 2014-2015
- Dated 31 Mar 2016Truing up of APPC for FY2015-16 and provisional APPC for FY2016-17
- Dated 30 Mar 2017Truing up of APPC for FY 2016-17 and provisional APPC for FY 2017-18
- Dated 2 Apr 2018Truing up of APPC for FY 2017-18 and provisional APPC for FY 2018-19, 2018
- Dated 5 Mar 2019APPC Truing Up for FY 2018-19 and Provisional APPC for FY 2019-20 — Notification
- Dated 19 Mar 2020Truing up of APPC for FY 2019-20 and notifying provisional APPC for FY 2020-21
- Dated 23 Apr 2021Truing up of APPC for FY2020-21 and Provisional APPC for FY2021-22 — Notification
- Dated 28 Mar 2023Truing up of APPC for FY 2022-23 and Provisional APPC for FY 2023-24 — Notification
- Dated 1 Apr 2023Truing up of APPC for FY 2023-24 and Provisional APPC for FY 2024-25 — Notification
- Dated 25 Mar 2024APPC True-up for FY 2023-24 and Provisional APPC for FY 2024-25 Order, 2024
- Dated 10 Apr 2026Truing up of APPC for FY 2025-26 and Provisional APPC for FY 2026-27
Earlier drafts
5 more documents belong here and are not on Voltaic: 5 copies in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.