Procurement of Energy from Renewable Sources (Fifth Amendment) Regulations, 2017

Karnataka Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (Fifth Amendment) Regulations, 2017

AmendmentDated 15 Feb 2018Published in the Gazette 20 Feb 2018In force from 1 Apr 2017Y/02/17/ dated 15.02.2018

Amends the Procurement of Energy from Renewable Sources Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Karnataka Electricity Regulatory Commission's Fifth Amendment to its renewable purchase obligation (RPO) framework, notified as Notification No. Y/02/17/ dated 15.02.2018 and printed in the Karnataka Gazette of 20 February 2018 (p1). Its short title says 2017, but the preamble is explicit that it further amends the KERC (Procurement of Energy from Renewable Sources) Regulations, 2011, and it extends to the whole of Karnataka (p1).

The preamble records that a draft was published for stakeholder comments and that a public hearing was held on 24.01.2018 (p1). Regulation 1 gives the short title, territorial application and commencement, which is 1 April 2017 — roughly ten months before the notification itself (p1).

Regulation 2 substitutes Clauses 4(i), 4(ii) and 4(iii) of the 2011 Regulations, printing the existing and amended versions side by side. The amended Clause 4(i) redefines the base for a distribution licensee's obligation as total procurement excluding hydro power, and re-casts the non-solar and solar RPO trajectories for BESCOM, MESCOM, CESC, HESCOM, GESCOM, HRECS and deemed licensees, raising solar targets for 2017-18 and 2018-19 and leaving 2019-20-and-onwards figures to be determined (p2). Clause 4(ii) does the same for grid-connected captive consumers and Clause 4(iii) for open access consumers (p3–4).

The substituted clauses carry the compliance mechanics with them: deemed compliance (and deemed non-compliance) for HRECS and deemed licensees buying bulk power from an ESCOM, with quarterly compliance reports passed down (p2); a combined-RPO rule for units of one legal entity spread across Karnataka (p3–4); carry-over of excess solar energy against a non-solar shortfall (p3–4); and a 2017-18 relaxation letting a licensee or consumer that reached 85% solar compliance meet the shortfall with excess non-solar energy (p3–4).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document