KERC · Karnataka Electricity Regulatory Commission
Procurement of Energy from Renewable Sources Regulations, 2011 — Ninth Amendment, 2022
Karnataka Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (Ninth Amendment) Regulations, 2022.
AmendmentDated 25 Nov 2022In force from 1 Apr 2022Notification No. KERC/DD(TRN)/Y/02/22/1849 dated 25.11.2022
Amends the Procurement of Energy from Renewable Sources Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is KERC's Ninth Amendment to its 2011 Renewable Purchase Obligation regulations, notified on 25.11.2022 (p1). The preamble records that it was driven by three external developments: the central Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022, CERC's new REC Regulations, 2022, and Karnataka's Renewable Energy Policy 2022-2027 (p1). A draft was published for objections and a public hearing was held on 03.11.2022 (p1).
Regulation 1 gives the short title, extends the regulations to the whole State, and makes them come into force retrospectively from 01.04.2022 — except the amendment to Regulation 3, which takes effect from 01.04.2023, with the old Regulation 3 continuing until 31.03.2023 (p2).
The operative part is a table in two columns, extant text against amended text. Regulation 2 is reworked with new definitions — accreditation, certificate, certificate multiplier, eligible entity, obligated entity and power exchange — and updated definitions of Central Agency, renewable sources of energy (widened to cover hybrid projects, pumped storage, storage charging from RE, green hydrogen and green ammonia) and State Agency (pp2–4). Regulation 3 lowers the applicability threshold for the RPO from 5 MW to 1 MW for captive consumers and for open access and power-exchange procurement, and adds procurement from other distribution licensees and traders (pp5–6). Regulation 5 lists the alternative compliance routes for obligated entities, adding direct procurement from developers, traders, other licensees with surplus RE, the power market, and green hydrogen/ammonia purchase (pp6–9). Regulation 6 recasts the State Agency as RPO compliance monitor and reporter, with quarterly website reporting and an annual report by 31 July (pp9–11). Regulation 7 sets accreditation eligibility and conditions for intrastate RE generators, captive RE generators and distribution licensees, including deemed accreditation, and moves revocation to SLDC (pp11–17). Regulation 9 splits tariff determination into generic tariff for specified small/other technologies, adoption of bid-discovered tariff with a ceiling for wind, MW-scale solar, co-generation and hybridisation, case-by-case determination for the rest, and a triennial ESCOM third-party cost-parameter study (pp17–21).
Read with this
The regulation
- Dated 16 Mar 2011Procurement of Energy from Renewable Sources Regulations, 2011
Amendments and corrections
- Dated 20 Dec 2011Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2011
- Dated 14 Sep 2012Procurement of Energy from Renewable Sources Regulations, 2011 — Second Amendment, 2012
- Dated 16 Nov 2015Procurement of Energy from Renewable Sources Regulations, 2011 — Third Amendment, 2015
- Dated 21 Feb 2017Procurement of Energy from Renewable Sources Regulations, 2011 — Fourth Amendment, 2016
- Dated 15 Feb 2018Procurement of Energy from Renewable Sources (Fifth Amendment) Regulations, 2017
- Dated 15 Nov 2018Procurement of Energy from Renewable Sources Regulations, 2011 — Sixth Amendment, 2018
- Dated 19 Nov 2019Procurement of Energy from Renewable Sources Regulations, 2011 — Seventh Amendment, 2019
- Dated 12 Jul 2022Procurement of Energy from Renewable Sources (Eighth Amendment) Regulations, 2022
- Dated 19 Jun 2024Procurement of Energy from Renewable Sources (Tenth Amendment) Regulations, 2024
- Dated 21 Jan 2025Procurement of Energy from Renewable Sources Regulations, 2011 — Eleventh Amendment, 2025
Procedures and orders made under it
- Dated 1 Feb 2012Average Pooled Cost for FY 2012 — Notification
- Dated 21 Jun 2013Average Pooled Cost for FY 2012-2013
- Dated 21 Apr 2014Average Pooled Cost for FY 2014-2015
- Dated 30 Jun 2014Average Pooled Cost for FY 2014-2015
- Dated 31 Mar 2016Truing up of APPC for FY2015-16 and provisional APPC for FY2016-17
- Dated 30 Mar 2017Truing up of APPC for FY 2016-17 and provisional APPC for FY 2017-18
- Dated 2 Apr 2018Truing up of APPC for FY 2017-18 and provisional APPC for FY 2018-19, 2018
- Dated 5 Mar 2019APPC Truing Up for FY 2018-19 and Provisional APPC for FY 2019-20 — Notification
- Dated 19 Mar 2020Truing up of APPC for FY 2019-20 and notifying provisional APPC for FY 2020-21
- Dated 23 Apr 2021Truing up of APPC for FY2020-21 and Provisional APPC for FY2021-22 — Notification
- Dated 28 Mar 2023Truing up of APPC for FY 2022-23 and Provisional APPC for FY 2023-24 — Notification
- Dated 1 Apr 2023Truing up of APPC for FY 2023-24 and Provisional APPC for FY 2024-25 — Notification
- Dated 25 Mar 2024APPC True-up for FY 2023-24 and Provisional APPC for FY 2024-25 Order, 2024
- Dated 10 Apr 2026Truing up of APPC for FY 2025-26 and Provisional APPC for FY 2026-27
Earlier drafts
5 more documents belong here and are not on Voltaic: 5 copies in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.