KERC · Karnataka Electricity Regulatory Commission

Procurement of Energy from Renewable Sources Regulations, 2011 — Ninth Amendment, 2022

Karnataka Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (Ninth Amendment) Regulations, 2022.

AmendmentDated 25 Nov 2022In force from 1 Apr 2022Notification No. KERC/DD(TRN)/Y/02/22/1849 dated 25.11.2022

Amends the Procurement of Energy from Renewable Sources Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is KERC's Ninth Amendment to its 2011 Renewable Purchase Obligation regulations, notified on 25.11.2022 (p1). The preamble records that it was driven by three external developments: the central Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022, CERC's new REC Regulations, 2022, and Karnataka's Renewable Energy Policy 2022-2027 (p1). A draft was published for objections and a public hearing was held on 03.11.2022 (p1).

Regulation 1 gives the short title, extends the regulations to the whole State, and makes them come into force retrospectively from 01.04.2022 — except the amendment to Regulation 3, which takes effect from 01.04.2023, with the old Regulation 3 continuing until 31.03.2023 (p2).

The operative part is a table in two columns, extant text against amended text. Regulation 2 is reworked with new definitions — accreditation, certificate, certificate multiplier, eligible entity, obligated entity and power exchange — and updated definitions of Central Agency, renewable sources of energy (widened to cover hybrid projects, pumped storage, storage charging from RE, green hydrogen and green ammonia) and State Agency (pp2–4). Regulation 3 lowers the applicability threshold for the RPO from 5 MW to 1 MW for captive consumers and for open access and power-exchange procurement, and adds procurement from other distribution licensees and traders (pp5–6). Regulation 5 lists the alternative compliance routes for obligated entities, adding direct procurement from developers, traders, other licensees with surplus RE, the power market, and green hydrogen/ammonia purchase (pp6–9). Regulation 6 recasts the State Agency as RPO compliance monitor and reporter, with quarterly website reporting and an annual report by 31 July (pp9–11). Regulation 7 sets accreditation eligibility and conditions for intrastate RE generators, captive RE generators and distribution licensees, including deemed accreditation, and moves revocation to SLDC (pp11–17). Regulation 9 splits tariff determination into generic tariff for specified small/other technologies, adoption of bid-discovered tariff with a ceiling for wind, MW-scale solar, co-generation and hybridisation, case-by-case determination for the rest, and a triennial ESCOM third-party cost-parameter study (pp17–21).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Renewable energy tariff

Read with this

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document