Skip to content

KERC · Karnataka Electricity Regulatory Commission

Procurement of Energy from Renewable Sources (Tenth Amendment) Regulations, 2024

Karnataka Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (Tenth Amendment) Regulations, 2024

AmendmentDated 19 Jun 2024Published in the Gazette 31 Mar 2011KERC/JD (Tech.)/2024/RPO Regulations/240 dated 19th June, 2024

Amends the Procurement of Energy from Renewable Sources Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The substantive instrument here is the KERC (Procurement of Energy from Renewable Sources) (Tenth Amendment) Regulations, 2024, notified on 19 June 2024 (p1). It is a compliance amendment rather than a policy change. The Commission recounts that clause 3(ii) of the Third Amendment, 2015 — which had pulled captive consumers running grid-connected captive and co-generation plants on non-renewable fuel (above 5 MW) into the renewable purchase obligation — was challenged in the High Court of Karnataka in W.P. 11771 of 2021 and connected petitions (p1–2).

The High Court's order of 01.03.2024, reproducing APTEL's judgment of 09.04.2019 in Appeal Nos. 322 and 333 of 2016, held that captive consumers with co-generating plants cannot be fastened with an RPO and that co-generation plants must be treated at par with renewable energy generating plants; the Department's SLP against that ruling was dismissed on delay (p2). The Commission states it is bound by the order and that public consultation was therefore unnecessary (p3).

Exercising its s.86(1)(e) read with s.181 powers, it substitutes the offending clause in the Third Amendment and the equivalent provision in the Ninth Amendment (p3–4). Regulation 1 sets out the title, statewide extent and a retrospective commencement tied to the original Gazette dates of the Third and Ninth Amendments (p3); Regulations 2 and 3 set out the substitutions in tabular form, though the substituted wording is only partially legible in this copy (p3–4).

From the foot of p4 a second, unrelated instrument opens: the KERC (Merit Order Despatch and Optimization of Power Purchase Cost) Regulations, 2024, dated 24.06.2024, whose preamble recites KPCL's Petition OP 06/2021 seeking a scheduling and despatch procedure and landed-cost computation by the SLDC (p4). Only the preamble is present.

Standard name
RPO Regulations, Power Procurement Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document