Procurement of Energy from Renewable Sources Regulations, 2011 — Second Amendment, 2012

Karnataka Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (Second Amendment) Regulations, 2012

AmendmentDated 14 Sep 2012No. S/03/1 dated 14.09.2012

Amends the Procurement of Energy from Renewable Sources Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Second Amendment to the KERC (Procurement of Energy from Renewable Sources) Regulations, 2011, issued by the Karnataka Electricity Regulatory Commission on 14.09.2012 (p1). It does one thing: it substitutes Clause 7(d) of the parent regulations, which governs when captive power producers based on renewable sources may be accredited to obtain renewable energy certificates (p1–2).

The Preamble (p1) records the lineage — the Principal Regulations of 16.03.2011 (gazetted 31.03.2011), a first amendment notified 20.12.2011 and gazetted 02.01.2012 — and states that a draft amendment to Clause 7(d) was published on 18.06.2012 for public comment, drawing written comments from four persons. Regulation 1 (p2) gives the short title, extends the amendment to the whole State, and brings it into force on gazette publication (gazette date not printed). Regulation 2 (p2) sets out the substitution in a three-column table reproducing the existing and the amended clause side by side.

The substantive change narrows and redirects eligibility: accreditation is limited to grid-connected CPPs, covering the energy generated and used for captive consumption plus any surplus sold to the State's distribution licensees at the average pooled power purchase cost notified by the Commission from time to time (p2).

Standard name
RPO Regulations
Primary topics
Renewable energy certificates (REC)

Read with this

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document