KERC · Karnataka Electricity Regulatory Commission

Procurement of Energy from Renewable Sources Regulations, 2011 — Sixth Amendment, 2018

Karnataka Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (Sixth Amendment) Regulations, 2018

AmendmentDated 15 Nov 2018Published in the Gazette 20 Dec 2018Y/01/18 dated 15.11.18

Amends the Procurement of Energy from Renewable Sources Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Karnataka Electricity Regulatory Commission's Sixth Amendment to its renewable purchase obligation (RPO) framework, notified as Notification No. Y/01/18 dated 15.11.2018 and carried in the Karnataka Gazette, Volume 153, Issue 50, on 20.12.2018 (p1). It was made under s.86(1)(e) read with s.181 of the Electricity Act, 2003, after the draft was published for stakeholder comments and a public hearing was held on 31.10.2018 (p1). It applies to the whole of Karnataka and takes effect from the date of gazette notification (p1).

The substantive change is Regulation 2, which rewrites clauses 4(i), 4(ii) and 4(iii) of the KERC (Procurement of Energy from Renewable Sources) Regulations, 2011. It is drafted as a two-column table showing the existing text alongside the substituted text (pp1-4). Clause 4(i) governs distribution licensees, with separate non-solar and solar RPO trajectories per licensee and financial year, and it now runs the schedule forward beyond 2018-19 into 2019-20 to 2022-23, leaving later years 'To be determined' (pp2-3). Clause 4(ii) does the same for grid-connected captive consumers and clause 4(iii) for open access consumers, each with non-solar and solar obligations (pp3-4).

The provisos carry most of the operational detail: deemed compliance for HRECS and deemed licensees that buy bulk power from an ESCOM that has met its RPO (with quarterly compliance reporting), the onus falling back on them if the ESCOM has not complied, set-off of excess solar against a non-solar shortfall in the same year, and a relaxation for 2017-18 allowing parties at 85% of the solar RPO to cover the gap with excess non-solar energy (pp2-4). An Explanation states that hydro is excluded from total procurement from 2017-18 onwards, but that mini-hydel is not treated as hydro for this purpose (p3). Page 5 is a corrigendum dated 31.12.2018 that renumbers a sub-clause of Regulation 1 and corrects wording in the new tables.

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC)

Read with this

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document