Procurement of Energy from Renewable Sources Regulations, 2011

Karnataka Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) Regulations, 2011

RegulationDated 16 Mar 2011In force from 1 Apr 2011Notification No. S/03/1 dated 16th March 2011

11 amendments to it are on Voltaic, the latest dated 21 Jan 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

KERC issued these Regulations by Notification No. S/03/1 dated 16 March 2011, replacing its 2004 renewable power procurement regulations (p1, p3–4). They apply to every distribution licensee in Karnataka and also to captive consumers using non-renewable generation with capacity above 5 MW, and to open access consumers with contract demand above 5 MW sourcing from non-renewable sources (p2). They take effect on 1 April 2011 (p1).

Regulation 4 is the operative core: it fixes licensee-wise renewable purchase obligations split between non-solar renewable sources and solar, and sets a separate 5% obligation for captive and open access consumers (p2). It allows a licensee to substitute other renewable energy or RECs where in-state solar is unavailable, preserves purchases under existing agreements as RPO-eligible, and requires licensees to disclose proposed RE purchases in their ERC filings (p2).

Regulation 5 lets licensees, captive and open access consumers meet the obligation wholly or partly through RECs (p2). Regulations 6 and 7 build the state-side framework: the State Agency must notify accreditation procedures within three months, guided by the Central Agency's rules, report quarterly, and levy Commission-fixed charges on RE generators. Accreditation is closed to generators holding subsisting PPAs and to those who terminated a PPA prematurely (one-year bar), and generators taking the REC route must sell to ESCOMs at the Commission-approved pooled cost escalated for inflation (p2–3).

Regulation 8 handles non-compliance through a Commission-determined deposit into a dedicated fund, spendable on renewable energy or energy conservation, with carry-forward of shortfalls where RE or RECs are unavailable (p3). Regulation 9 sets the tariff-determination framework, preserving approved and deemed PPAs and adopting s.63 bid tariffs (p3). Regulations 10–12 grant powers to amend, call for information and remove difficulties; Regulation 13 repeals the 2004 Regulations with a savings clause (p3–4).

Standard name
RPO Regulations, REC Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Renewable energy tariff

Read with this

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document