Skip to content

KERC · Karnataka Electricity Regulatory Commission

Procurement of Energy from Renewable Sources (Eighth Amendment) Regulations, 2022

Karnataka Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (Eighth Amendment) Regulations, 2022

AmendmentDated 12 Jul 2022In force from 1 Apr 2022Y/01/22/462 dated 12.07.2022

Amends the Procurement of Energy from Renewable Sources Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Eighth Amendment to KERC's renewable purchase obligation (RPO) regulations, notified on 12 July 2022 (p1) and brought into force from 1 April 2022 (p2) — over three months before it was notified. It rewrites the RPO provisions of the KERC (Procurement of Energy from Renewable Sources) Regulations, 2011.

The preamble sets out why: the sixth amendment had fixed an RPO trajectory only up to FY2021-22, so a fresh trajectory was needed; a draft was published in four newspapers on 23 April 2022 and a public hearing held on 20 May 2022 (p1). The Commission then decided four things (p1–2): to abandon separate solar and non-solar RPO; to apply to captive and open access consumers the same RPO as the area distribution licensee; to drop the hydro purchase obligation; and to fix a three-year control period, with the trajectory beyond it to follow the Government of India's national RPO notification.

Operatively, Regulation 2 substitutes clauses 4(i), 4(ii) and 4(iii) of the 2011 Regulations through existing-versus-amended comparison tables (p2–6). Clause 4(i) imposes a single, technology-neutral RPO on every distribution licensee as a share of total procurement excluding hydro, with ESCOM-wise targets for FY2022-23 to FY2024-25; HRECS and deemed licensees follow the ESCOM of their area (p2). Clause 4(ii) does the same for grid-connected captive consumers, keyed to the ESCOM area in which they sit (p4), and clause 4(iii) for open access consumers (p5). Provisos permitting solar/non-solar substitution and the First Proviso to Regulation 5 are deleted (p3, p6). The pre-2022-23 framework under the KERC REC Framework Regulations, 2011 continues to apply (p2, p4).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC)

Read with this

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document