Skip to content

KERC · Karnataka Electricity Regulatory Commission

Recovery of Expenditure for Supply of Electricity (Third Amendment) Regulations, 2004

KERC (Recovery of Expenditure for Supply of Electricity) (Third Amendment) Regulations, 2004

AmendmentDated 12 Jan 2006No.Y/01/4 dated 12th January, 2006

Amends the Recovery of Expenditure for Supply of Electricity Regulations 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Karnataka Electricity Regulatory Commission's notification No. Y/01/4 dated 12 January 2006 (p1) makes the Third Amendment to the KERC (Recovery of Expenditure for Supply of Electricity) Regulations, 2004 — the regulations that let a distribution licensee charge a person for the line and plant needed to give him supply. The preamble records that difficulties had been reported in implementing eight sub-clauses of the parent regulations — 3.1.1, 3.1.2, 3.1.5, 3.1.7, 3.2.1, 3.2.3, 3.2.4 and 3.6.3 — and the Commission substitutes all of them (p1).

Part I gives the short title (which still carries the year 2004), commencement from the date of publication in the official Gazette, and extent to the whole of Karnataka (p1). Part II is the operative substitution table, laid out as existing text against proposed text, running from p2 to p17.

The first rows rewrite clause 3.1 on LT supply. They restate the slabs by which the licensee recovers the cost of electric line/plant up to the point of connection for domestic, commercial, mixed and industrial installations; define the point of connection as a terminal pole within 30 metres outside the applicant's premises; and prescribe how additional load to an existing installation is charged, including one-time payments where the total built-up area crosses the clause 3.1.5 threshold (pp2–5). They set when the applicant must himself provide space, transformer, switchgear and allied equipment and when the licensee must arrange supply instead (pp6, 8–14). A cut-off of 25 August 2005 — the Gazette date of the Second Amendment — separates buildings planned before and after it, and buildings serviced earlier are given transitional treatment (pp6, 8, 12–14). Area-specific levies towards HT/LT underground cable and ABC systems apply in the Bangalore Metropolitan Area, the named city municipal councils and BDA areas (pp4–5, 10–15). The institutional categories covered by or exempted from clause 3.1.5 are listed at p9.

The later rows turn to layouts: cost recovery for approved layouts, charges in village, town panchayat and revenue-site areas, the applicant's obligation to provide a substation where a cluster's requisitioned load crosses the stated threshold, and the licensee's supervision charge where the applicant self-executes the work (pp15–17). The notification is signed by the Secretary, by order of the Commission (p17).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes, Supply to buildings and colonies

Read with this

Amendments and corrections

Procedures and orders made under it

6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 amendment not held as English text.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document