The Karnataka Electricity Regulatory Commission's notification No. Y/01/4 dated 12 January 2006 (p1) makes the Third Amendment to the KERC (Recovery of Expenditure for Supply of Electricity) Regulations, 2004 — the regulations that let a distribution licensee charge a person for the line and plant needed to give him supply. The preamble records that difficulties had been reported in implementing eight sub-clauses of the parent regulations — 3.1.1, 3.1.2, 3.1.5, 3.1.7, 3.2.1, 3.2.3, 3.2.4 and 3.6.3 — and the Commission substitutes all of them (p1).
Part I gives the short title (which still carries the year 2004), commencement from the date of publication in the official Gazette, and extent to the whole of Karnataka (p1). Part II is the operative substitution table, laid out as existing text against proposed text, running from p2 to p17.
The first rows rewrite clause 3.1 on LT supply. They restate the slabs by which the licensee recovers the cost of electric line/plant up to the point of connection for domestic, commercial, mixed and industrial installations; define the point of connection as a terminal pole within 30 metres outside the applicant's premises; and prescribe how additional load to an existing installation is charged, including one-time payments where the total built-up area crosses the clause 3.1.5 threshold (pp2–5). They set when the applicant must himself provide space, transformer, switchgear and allied equipment and when the licensee must arrange supply instead (pp6, 8–14). A cut-off of 25 August 2005 — the Gazette date of the Second Amendment — separates buildings planned before and after it, and buildings serviced earlier are given transitional treatment (pp6, 8, 12–14). Area-specific levies towards HT/LT underground cable and ABC systems apply in the Bangalore Metropolitan Area, the named city municipal councils and BDA areas (pp4–5, 10–15). The institutional categories covered by or exempted from clause 3.1.5 are listed at p9.
The later rows turn to layouts: cost recovery for approved layouts, charges in village, town panchayat and revenue-site areas, the applicant's obligation to provide a substation where a cluster's requisitioned load crosses the stated threshold, and the licensee's supervision charge where the applicant self-executes the work (pp15–17). The notification is signed by the Secretary, by order of the Commission (p17).
Read with this
The regulation
- Dated 12 Nov 2004Recovery of Expenditure for Supply of Electricity Regulations 2004
Amendments and corrections
- Dated 25 Mar 2005Recovery of Expenditure for Supply of Electricity (Amendment) Regulations, 2005
- Dated 17 Aug 2005Recovery of Expenditure for Supply of Electricity (Second Amendment) Regulations, 2005
- Dated 24 Aug 2007Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fourth Amendment
- Dated 19 Feb 2010Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fifth Amendment, 2010
- Dated 7 Sep 2011Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Sixth Amendment, 2011
- Dated 25 Aug 2014Recovery of Expenditure for Supply of Electricity (Seventh Amendment) Regulations, 2004
- Dated 22 Nov 2016Recovery of Expenditure for Supply of Electricity (Eighth Amendment) Regulations, 2016
- Dated 27 Dec 2017Recovery of Expenditure for Supply of Electricity (Ninth Amendment) Regulations, 2017
- Dated 11 Dec 2020Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
- Dated 11 Dec 2020Karnataka Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
- Dated 11 Dec 2020Recovery of Expenditure for Supply of Electricity Regulations, 2020 — 11th Amendment
- Dated 11 Jan 2023Conditions of Supply (CoS) Eleventh Amendment and Recovery of Expenditure (RoE) Twelfth Amendment, 2023
Procedures and orders made under it
6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 amendment not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.