Summary
Summary written by software. Check the regulator's original before you rely on it.
This is KERC's cost-recovery regulation setting out what a distribution licensee in Karnataka may charge a person who asks for supply, and what the applicant must build, fund and hand over instead. It was issued by notification on 12 November 2004 and notified in the Karnataka Gazette on 16 December 2004 (pp.2216–2222), and comes into force on that Gazette notification (p1).
Chapter I states the title, commencement and that the regulations apply to every distribution licensee in its own licensed area in Karnataka (p1). Chapter II defines the working vocabulary the rest depends on — applicant, distribution licensee, distribution main and distribution system, electric line, electrical plant, the LT/HT/EHT voltage bands, point of commencement of supply, premises, service line and the licensee's periodically published Schedule of Rates; undefined words take their Electricity Act 2003 meaning, and the 2003 Act prevails over the 1999 reform Act if they conflict (p1–3).
Chapter III is the operative core. Clause 3.1 governs ordinary LT connections outside layouts: slab-based recovery of line and plant cost up to the terminal pole (with the point of connection defined for that clause), a self-execution option against a supervision charge, the applicant-funded service line inside the premises, supply within the KERC Duty to Supply timelines, and — at the stated load and built-up-area threshold — an obligation on the applicant to provide transformer space and equipment, subject to a list of institutional exemptions (p3–7). Clause 3.2 covers layout electrification: developer-executed works, a maintenance agreement until a set share of plots are energised, licensee takeover, a guarantee period, weaker-section sites, defaulting developers, and very large loads requiring the developer to fund a substation (p7–8). Clauses 3.3–3.5 route IP sets to GoK policy and place LT water supply and street lighting on scheme budgeting or licensee estimates (p9). Clause 3.6 deals with HT/EHT supply: estimate-based recovery of lines drawn exclusively for an applicant, capex-funded augmentation, self-execution guarantees and augmentation charges (p9–10).
Chapter IV reserves to the Commission the power to remove difficulties, issue orders and practice directions, and amend the regulations (p10–11).
Read with this
Amendments and corrections
- Dated 25 Mar 2005Recovery of Expenditure for Supply of Electricity (Amendment) Regulations, 2005
- Dated 17 Aug 2005Recovery of Expenditure for Supply of Electricity (Second Amendment) Regulations, 2005
- Dated 12 Jan 2006Recovery of Expenditure for Supply of Electricity (Third Amendment) Regulations, 2004
- Dated 24 Aug 2007Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fourth Amendment
- Dated 19 Feb 2010Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fifth Amendment, 2010
- Dated 7 Sep 2011Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Sixth Amendment, 2011
- Dated 25 Aug 2014Recovery of Expenditure for Supply of Electricity (Seventh Amendment) Regulations, 2004
- Dated 22 Nov 2016Recovery of Expenditure for Supply of Electricity (Eighth Amendment) Regulations, 2016
- Dated 27 Dec 2017Recovery of Expenditure for Supply of Electricity (Ninth Amendment) Regulations, 2017
- Dated 11 Dec 2020Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
- Dated 11 Dec 2020Karnataka Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
- Dated 11 Dec 2020Recovery of Expenditure for Supply of Electricity Regulations, 2020 — 11th Amendment
- Dated 11 Jan 2023Conditions of Supply (CoS) Eleventh Amendment and Recovery of Expenditure (RoE) Twelfth Amendment, 2023
Procedures and orders made under it
6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 amendment not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.