Skip to content

KERC · Karnataka Electricity Regulatory Commission

Recovery of Expenditure for Supply of Electricity Regulations 2004

KERC (Recovery of Expenditure for Supply of Electricity) Regulations 2004

RegulationDated 12 Nov 2004Published in the Gazette 16 Dec 2004Y/01/4 dated 12-11-2004

13 amendments to it are on Voltaic, the latest dated 11 Jan 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is KERC's cost-recovery regulation setting out what a distribution licensee in Karnataka may charge a person who asks for supply, and what the applicant must build, fund and hand over instead. It was issued by notification on 12 November 2004 and notified in the Karnataka Gazette on 16 December 2004 (pp.2216–2222), and comes into force on that Gazette notification (p1).

Chapter I states the title, commencement and that the regulations apply to every distribution licensee in its own licensed area in Karnataka (p1). Chapter II defines the working vocabulary the rest depends on — applicant, distribution licensee, distribution main and distribution system, electric line, electrical plant, the LT/HT/EHT voltage bands, point of commencement of supply, premises, service line and the licensee's periodically published Schedule of Rates; undefined words take their Electricity Act 2003 meaning, and the 2003 Act prevails over the 1999 reform Act if they conflict (p1–3).

Chapter III is the operative core. Clause 3.1 governs ordinary LT connections outside layouts: slab-based recovery of line and plant cost up to the terminal pole (with the point of connection defined for that clause), a self-execution option against a supervision charge, the applicant-funded service line inside the premises, supply within the KERC Duty to Supply timelines, and — at the stated load and built-up-area threshold — an obligation on the applicant to provide transformer space and equipment, subject to a list of institutional exemptions (p3–7). Clause 3.2 covers layout electrification: developer-executed works, a maintenance agreement until a set share of plots are energised, licensee takeover, a guarantee period, weaker-section sites, defaulting developers, and very large loads requiring the developer to fund a substation (p7–8). Clauses 3.3–3.5 route IP sets to GoK policy and place LT water supply and street lighting on scheme budgeting or licensee estimates (p9). Clause 3.6 deals with HT/EHT supply: estimate-based recovery of lines drawn exclusively for an applicant, capex-funded augmentation, self-execution guarantees and augmentation charges (p9–10).

Chapter IV reserves to the Commission the power to remove difficulties, issue orders and practice directions, and amend the regulations (p10–11).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes, Supply to buildings and colonies

Read with this

Amendments and corrections

Procedures and orders made under it

6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 amendment not held as English text.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document