Skip to content

KERC · Karnataka Electricity Regulatory Commission

Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fourth Amendment

KERC (Recovery of Expenditure for Supply of Electricity) (Fourth Amendment) Regulations, 2004

AmendmentDated 24 Aug 2007Notification No.Y/01/4 dated 24th August, 2007

Amends the Recovery of Expenditure for Supply of Electricity Regulations 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fourth Amendment to the KERC (Recovery of Expenditure for Supply of Electricity) Regulations, 2004, issued by the Karnataka Electricity Regulatory Commission on 24 August 2007 (p1). The preamble states the motive plainly: suggestions on reducing electrical accidents in the ESCOMs were placed before the Commission, which decided to amend sub-clause 3.2.1 accordingly (p1).

The operative change is a single substitution. The existing sub-clause 3.2.1(vi) is replaced by a new provision requiring the developer to use Aerial Bunched Cables for 11 kV and LT lines in new layouts (p2). Because the existing text of that sub-clause was 'Nil', the requirement is newly created rather than tightened (p2).

In practice the duty is not statewide: the new sub-clause lists the areas where it bites — specified Municipal Corporation, CMC and TMC areas falling under BESCOM, CESC, GESCOM, HESCOM and MESCOM (p2).

Clause I carries the formal machinery: the short title (which, as printed, still says 2004), commencement from the date of publication in the Karnataka Gazette, and extension to the whole state of Karnataka (p1). The Gazette date is not printed. The notification is signed by the Secretary by order of the Commission (p2).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Electrical safety, Technical standards

Read with this

Amendments and corrections

Procedures and orders made under it

6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 amendment not held as English text.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document