KERC · Karnataka Electricity Regulatory Commission
Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fourth Amendment
KERC (Recovery of Expenditure for Supply of Electricity) (Fourth Amendment) Regulations, 2004
AmendmentDated 24 Aug 2007Notification No.Y/01/4 dated 24th August, 2007
Amends the Recovery of Expenditure for Supply of Electricity Regulations 2004.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Fourth Amendment to the KERC (Recovery of Expenditure for Supply of Electricity) Regulations, 2004, issued by the Karnataka Electricity Regulatory Commission on 24 August 2007 (p1). The preamble states the motive plainly: suggestions on reducing electrical accidents in the ESCOMs were placed before the Commission, which decided to amend sub-clause 3.2.1 accordingly (p1).
The operative change is a single substitution. The existing sub-clause 3.2.1(vi) is replaced by a new provision requiring the developer to use Aerial Bunched Cables for 11 kV and LT lines in new layouts (p2). Because the existing text of that sub-clause was 'Nil', the requirement is newly created rather than tightened (p2).
In practice the duty is not statewide: the new sub-clause lists the areas where it bites — specified Municipal Corporation, CMC and TMC areas falling under BESCOM, CESC, GESCOM, HESCOM and MESCOM (p2).
Clause I carries the formal machinery: the short title (which, as printed, still says 2004), commencement from the date of publication in the Karnataka Gazette, and extension to the whole state of Karnataka (p1). The Gazette date is not printed. The notification is signed by the Secretary by order of the Commission (p2).
Read with this
The regulation
- Dated 12 Nov 2004Recovery of Expenditure for Supply of Electricity Regulations 2004
Amendments and corrections
- Dated 25 Mar 2005Recovery of Expenditure for Supply of Electricity (Amendment) Regulations, 2005
- Dated 17 Aug 2005Recovery of Expenditure for Supply of Electricity (Second Amendment) Regulations, 2005
- Dated 12 Jan 2006Recovery of Expenditure for Supply of Electricity (Third Amendment) Regulations, 2004
- Dated 19 Feb 2010Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fifth Amendment, 2010
- Dated 7 Sep 2011Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Sixth Amendment, 2011
- Dated 25 Aug 2014Recovery of Expenditure for Supply of Electricity (Seventh Amendment) Regulations, 2004
- Dated 22 Nov 2016Recovery of Expenditure for Supply of Electricity (Eighth Amendment) Regulations, 2016
- Dated 27 Dec 2017Recovery of Expenditure for Supply of Electricity (Ninth Amendment) Regulations, 2017
- Dated 11 Dec 2020Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
- Dated 11 Dec 2020Karnataka Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
- Dated 11 Dec 2020Recovery of Expenditure for Supply of Electricity Regulations, 2020 — 11th Amendment
- Dated 11 Jan 2023Conditions of Supply (CoS) Eleventh Amendment and Recovery of Expenditure (RoE) Twelfth Amendment, 2023
Procedures and orders made under it
6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 amendment not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.