KERC · Karnataka Electricity Regulatory Commission
Conditions of Supply (CoS) Eleventh Amendment and Recovery of Expenditure (RoE) Twelfth Amendment, 2023
Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka (CoS) (Eleventh Amendment) 2023, and the Karnataka Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity) (Twelfth Amendment) Regulations, 2023.
AmendmentDated 11 Jan 2023KERC/17/1008/CoS-RoE/DDD/22-23/2184 dated 11.01.2023
Amends the Recovery of Expenditure for Supply of Electricity Regulations 2004.
Summary
Summary written by software. Check the regulator's original before you rely on it.
KERC notification No. KERC/17/1008/CoS-RoE/DDD/22-23/2184 dated 11.01.2023 issues two instruments together: the Eleventh Amendment to the Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka (CoS), 2006, and the Twelfth Amendment to the KERC (Recovery of Expenditure for Supply of Electricity) Regulations, 2004 (p1). The preamble sets out the consultation history — earlier draft amendments on 66 kV contract-demand limits and on supply to unapproved layouts/revenue sites, public hearings and revised drafts — and states the Commission's decision to replace 'sanctioned plan' and 'approved plan' with 'plan' in the CoS and RoE to align with the duty to supply (p1–4). Clause 1 gives the two short titles and commencement: in force from publication in the Karnataka Gazette, applying to all distribution licensees and consumers in Karnataka (p4). Clause 2 then amends CoS 2006 through a table of substituted clauses covering built-up-area definition, standard supply voltages and augmentation charges, application documents for multi-storey buildings and layouts, temporary supply estimates/charges/refunds, meter reading and group billing with AMR/smart meters, HT-to-LT conversion, and maximum-demand penalties for interconnected EHT consumers (p5–13). A second table amends RoE 2004, dealing with layout contribution/extension costs and power supply to unapproved layouts/sites, land-cost recovery and indemnity (p14–16). The amendments are composite and technical, and the gazette publication date is not printed in this text.
Read with this
The regulation
- Dated 12 Nov 2004Recovery of Expenditure for Supply of Electricity Regulations 2004
Amendments and corrections
- Dated 25 Mar 2005Recovery of Expenditure for Supply of Electricity (Amendment) Regulations, 2005
- Dated 17 Aug 2005Recovery of Expenditure for Supply of Electricity (Second Amendment) Regulations, 2005
- Dated 12 Jan 2006Recovery of Expenditure for Supply of Electricity (Third Amendment) Regulations, 2004
- Dated 24 Aug 2007Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fourth Amendment
- Dated 19 Feb 2010Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fifth Amendment, 2010
- Dated 7 Sep 2011Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Sixth Amendment, 2011
- Dated 25 Aug 2014Recovery of Expenditure for Supply of Electricity (Seventh Amendment) Regulations, 2004
- Dated 22 Nov 2016Recovery of Expenditure for Supply of Electricity (Eighth Amendment) Regulations, 2016
- Dated 27 Dec 2017Recovery of Expenditure for Supply of Electricity (Ninth Amendment) Regulations, 2017
- Dated 11 Dec 2020Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
- Dated 11 Dec 2020Karnataka Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
- Dated 11 Dec 2020Recovery of Expenditure for Supply of Electricity Regulations, 2020 — 11th Amendment
Procedures and orders made under it
6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 amendment not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.