Skip to content

KERC · Karnataka Electricity Regulatory Commission

Conditions of Supply (CoS) Eleventh Amendment and Recovery of Expenditure (RoE) Twelfth Amendment, 2023

Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka (CoS) (Eleventh Amendment) 2023, and the Karnataka Electricity Regulatory Commission (Recovery of Expenditure for Supply of Electricity) (Twelfth Amendment) Regulations, 2023.

AmendmentDated 11 Jan 2023KERC/17/1008/CoS-RoE/DDD/22-23/2184 dated 11.01.2023

Amends the Recovery of Expenditure for Supply of Electricity Regulations 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

KERC notification No. KERC/17/1008/CoS-RoE/DDD/22-23/2184 dated 11.01.2023 issues two instruments together: the Eleventh Amendment to the Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka (CoS), 2006, and the Twelfth Amendment to the KERC (Recovery of Expenditure for Supply of Electricity) Regulations, 2004 (p1). The preamble sets out the consultation history — earlier draft amendments on 66 kV contract-demand limits and on supply to unapproved layouts/revenue sites, public hearings and revised drafts — and states the Commission's decision to replace 'sanctioned plan' and 'approved plan' with 'plan' in the CoS and RoE to align with the duty to supply (p1–4). Clause 1 gives the two short titles and commencement: in force from publication in the Karnataka Gazette, applying to all distribution licensees and consumers in Karnataka (p4). Clause 2 then amends CoS 2006 through a table of substituted clauses covering built-up-area definition, standard supply voltages and augmentation charges, application documents for multi-storey buildings and layouts, temporary supply estimates/charges/refunds, meter reading and group billing with AMR/smart meters, HT-to-LT conversion, and maximum-demand penalties for interconnected EHT consumers (p5–13). A second table amends RoE 2004, dealing with layout contribution/extension costs and power supply to unapproved layouts/sites, land-cost recovery and indemnity (p14–16). The amendments are composite and technical, and the gazette publication date is not printed in this text.

Standard name
Electricity Supply Code, Recovery of Expenditure and Miscellaneous Charges
Primary topics
Conditions of supply, Connection and miscellaneous charges, Supply to buildings and colonies

Read with this

Amendments and corrections

Procedures and orders made under it

6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 amendment not held as English text.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document