KERC · Karnataka Electricity Regulatory Commission
Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka (CoS) (Ninth Amendment), 2020, the KERC (Recovery of Expenditure for Supply of Electricity) (Eleventh Amendment) Regulations, 2020 and the KERC (Security Deposit) (Second Amendment) Regulations, 2020
AmendmentDated 11 Dec 2020Published in the Gazette 24 Dec 2020KERC/CoS/Tech/DDD/05/20-21/976 dated 11.12.2020
Amends the Security Deposit Regulations, 2007.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a single KERC notification issued on 11 December 2020 and published in the Karnataka Gazette of 24 December 2020. It carries three amendment regulations in one document, all responding to BESCOM's push to cut the time and paperwork for new LT electricity connections under the State's Ease of Doing Business (EODB) agenda (p1, p3–4).
The preamble (pp1–3) sets out the background: BESCOM filed OP 21/2020 under clause 46 of the Conditions of Supply after Government of Karnataka directions, in view of the World Bank's proposal to rank Bengaluru in Ease of Doing Business 2021 on 'Getting Electricity'. Drafts were published on 22 October 2020 for 30 days' comment; no public hearing was held because of Covid-19, and stakeholder objections (bank guarantee in place of deposits, ESCOMs bearing infrastructure cost) are recorded. Clause 1 names the three instruments, applies them to all distribution licensees and consumers in Karnataka, and brings them into force on Gazette publication (p4).
Clause 2 (pp4–11) then runs three clause-by-clause substitution tables. The CoS Ninth Amendment reclassifies 400 V and HT supply, inserts a new clause 4.10 laying down eligibility criteria, mandatory documents and a self-declaration route for EODB connections, widens mixed-load LT metering, and adds electronic/digital payment modes. The RoE Eleventh Amendment revises which loads may be served on LT, re-slabs the recoverable amounts, and withdraws the Bangalore Metropolitan cable surcharge for higher loads (pp8–10). The Security Deposit Second Amendment permits the Initial Security Deposit by electronic/digital mode (p11).
Annexure-12 (pp11–14) is the self-declaration form applicants upload in place of completion reports, CEIG, lift and fire clearances and agreements, containing 28 undertakings on ownership, wiring safety, arrears and security deposits. Pages 14 onwards carry an unrelated Government of Karnataka Legal Metrology notification on repairing charges for weighing instruments, which is not part of this instrument.
Read with this
Read with this: Security Deposit Regulations, 2007
The regulation
- Dated 1 Oct 2007Security Deposit Regulations, 2007
Amendments and corrections
One more document belongs here and is not on Voltaic: a copy in another language.
It is also read with: Recovery of Expenditure for Supply of Electricity Regulations 2004
Amends the Recovery of Expenditure for Supply of Electricity Regulations 2004.
The regulation
- Dated 12 Nov 2004Recovery of Expenditure for Supply of Electricity Regulations 2004
Amendments and corrections
- Dated 25 Mar 2005Recovery of Expenditure for Supply of Electricity (Amendment) Regulations, 2005
- Dated 17 Aug 2005Recovery of Expenditure for Supply of Electricity (Second Amendment) Regulations, 2005
- Dated 12 Jan 2006Recovery of Expenditure for Supply of Electricity (Third Amendment) Regulations, 2004
- Dated 24 Aug 2007Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fourth Amendment
- Dated 19 Feb 2010Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fifth Amendment, 2010
- Dated 7 Sep 2011Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Sixth Amendment, 2011
- Dated 25 Aug 2014Recovery of Expenditure for Supply of Electricity (Seventh Amendment) Regulations, 2004
- Dated 22 Nov 2016Recovery of Expenditure for Supply of Electricity (Eighth Amendment) Regulations, 2016
- Dated 27 Dec 2017Recovery of Expenditure for Supply of Electricity (Ninth Amendment) Regulations, 2017
- Dated 11 Dec 2020Karnataka Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
- Dated 11 Dec 2020Recovery of Expenditure for Supply of Electricity Regulations, 2020 — 11th Amendment
- Dated 11 Jan 2023Conditions of Supply (CoS) Eleventh Amendment and Recovery of Expenditure (RoE) Twelfth Amendment, 2023
Procedures and orders made under it
6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 amendment not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.