KERC · Karnataka Electricity Regulatory Commission
Recovery of Expenditure for Supply of Electricity (Second Amendment) Regulations, 2005
KERC (Recovery of Expenditure for Supply of Electricity) ( Second Amendment) Regulations, 2005
AmendmentDated 17 Aug 2005No.Y/01/4 dated 17th August, 2005
Amends the Recovery of Expenditure for Supply of Electricity Regulations 2004.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Karnataka Electricity Regulatory Commission's Notification No. Y/01/4 dated 17 August 2005 makes the Second Amendment to the KERC (Recovery of Expenditure for Supply of Electricity) Regulations, 2004 (p1). The parent Regulations were notified on 12 November 2004 and published in Part-3 of the Karnataka Gazette on 16 December 2004 at pages 2216–2222 (p1). The preamble records that difficulties in implementing sub-clauses 3.1.1, 3.1.5 and 3.1.7 of the parent Regulations were brought to the Commission's notice, and that the amendment is made to remove them (p1).
Part I sets the title (Second Amendment Regulations, 2005), provides that the amendment comes into force from the date of publication in the official Gazette of Karnataka, and extends it to the whole of Karnataka (p1). The Gazette date itself is not printed in this text, so the in-force date cannot be fixed from the document alone.
The operative Part II substitutes the existing text of the three sub-clauses, presented as a two-column table showing "as existing" against "as amended", running from page 2 to page 6. The substituted Note to 3.1.1 governs the maximum limit applicable to apartments and complexes and LT supply to individual houses (pp 1–2). The substituted 3.1.5 governs what an applicant with a built-up area above the threshold must provide — an electrical room, clear space and the distribution transformer with associated equipment — and what the licensee may collect where the applicant cannot provide them (pp 2–5). The substituted 3.1.7 extends the 3.1.5 requirements to existing consumers seeking additional load above a threshold and sets out how charges are computed on total load (pp 4–5). The notification is authenticated by the Secretary I/C, KERC (p6).
Read with this
The regulation
- Dated 12 Nov 2004Recovery of Expenditure for Supply of Electricity Regulations 2004
Amendments and corrections
- Dated 25 Mar 2005Recovery of Expenditure for Supply of Electricity (Amendment) Regulations, 2005
- Dated 12 Jan 2006Recovery of Expenditure for Supply of Electricity (Third Amendment) Regulations, 2004
- Dated 24 Aug 2007Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fourth Amendment
- Dated 19 Feb 2010Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fifth Amendment, 2010
- Dated 7 Sep 2011Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Sixth Amendment, 2011
- Dated 25 Aug 2014Recovery of Expenditure for Supply of Electricity (Seventh Amendment) Regulations, 2004
- Dated 22 Nov 2016Recovery of Expenditure for Supply of Electricity (Eighth Amendment) Regulations, 2016
- Dated 27 Dec 2017Recovery of Expenditure for Supply of Electricity (Ninth Amendment) Regulations, 2017
- Dated 11 Dec 2020Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
- Dated 11 Dec 2020Karnataka Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
- Dated 11 Dec 2020Recovery of Expenditure for Supply of Electricity Regulations, 2020 — 11th Amendment
- Dated 11 Jan 2023Conditions of Supply (CoS) Eleventh Amendment and Recovery of Expenditure (RoE) Twelfth Amendment, 2023
Procedures and orders made under it
6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 amendment not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.