Order on Reactivation, Development and Infrastructure Charges and Contract Demand, 2025

In the matter of: 1. Streamlining of reactivation procedures for installations disconnected at structurally intact premises. 2. Clarifying the methodology for levying Development and Infrastructure Charges. 3. Revising the permissible limit of Contract Demand (CD) based on technical feasibility.

OrderDated 28 Aug 2025

Made under the Recovery of Expenditure for Supply of Electricity Regulations 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Order dated 28 August 2025 from the Karnataka Electricity Regulatory Commission (p1, p4). It responds to BESCOM and MESCOM proposals, public-hearing concerns and an HT consumer representation, and uses the removal-of-difficulties clause in the Conditions of Supply (CoS) (p1–3). It issues directions on three matters and tells the office to propose amendments to the CoS and KERC Recovery Regulations (p4).

First, reactivation (p1–3, p3–4): where a consumer's power supply agreement has been terminated but the building remains structurally intact and has not been demolished or structurally altered, the installation may be reactivated. The consumer must pay the applicable security deposit and settle all outstanding dues, including fixed charges accrued for the entire inactive period up to reactivation. This replaces the need for a fresh application and full technical feasibility process.

Second, development and infrastructure charges (p2–4): the Commission clarifies that charges towards development of electric line/plant are levied only on the assessed load calculated under clause 3.2.1 of the KERC (Recovery of Charges for Supply of Electricity) Regulations, where the applicant/developer has not laid the line/plant up to the point of connection. Service line cost under clause 3.1.1 applies to the requisitioned load beyond the assessed load, and not at all where requisitioned load equals assessed load. For extra load or additional connections within the premises beyond the assessed load, service line charges apply under clause 3.1.1. References to 'requisitioned load' in clauses 3.2.3, 3.2.4 and 3.2.5 are modified to mean assessed load.

Third, Contract Demand (p3–4): the CoS and KERC Recovery Regulations limits on CD are removed for HT/EHT supply at 33 kV, 66 kV and 110 kV. CD is instead subject to technical feasibility — voltage regulation and bus voltages within limits, available transformer capacity at substations, and line loadings within thermal ratings. Augmentation charges are prescribed for CD above specified thresholds at each voltage, with collections at 66 kV and above transferred to the transmission licensee. The order ends by directing the office to propose necessary amendments to the relevant CoS/KERC Regulations.

Standard name
Electricity Supply Code, Recovery of Expenditure and Miscellaneous Charges
Primary topics
Conditions of supply, New connections and load changes, Connection and miscellaneous charges

Read with this

Amendments and corrections

6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 amendment not held as English text.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document