KERC · Karnataka Electricity Regulatory Commission
Order on Reactivation, Development and Infrastructure Charges and Contract Demand, 2025
In the matter of: 1. Streamlining of reactivation procedures for installations disconnected at structurally intact premises. 2. Clarifying the methodology for levying Development and Infrastructure Charges. 3. Revising the permissible limit of Contract Demand (CD) based on technical feasibility.
OrderDated 28 Aug 2025
Made under the Recovery of Expenditure for Supply of Electricity Regulations 2004.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Order dated 28 August 2025 from the Karnataka Electricity Regulatory Commission (p1, p4). It responds to BESCOM and MESCOM proposals, public-hearing concerns and an HT consumer representation, and uses the removal-of-difficulties clause in the Conditions of Supply (CoS) (p1–3). It issues directions on three matters and tells the office to propose amendments to the CoS and KERC Recovery Regulations (p4).
First, reactivation (p1–3, p3–4): where a consumer's power supply agreement has been terminated but the building remains structurally intact and has not been demolished or structurally altered, the installation may be reactivated. The consumer must pay the applicable security deposit and settle all outstanding dues, including fixed charges accrued for the entire inactive period up to reactivation. This replaces the need for a fresh application and full technical feasibility process.
Second, development and infrastructure charges (p2–4): the Commission clarifies that charges towards development of electric line/plant are levied only on the assessed load calculated under clause 3.2.1 of the KERC (Recovery of Charges for Supply of Electricity) Regulations, where the applicant/developer has not laid the line/plant up to the point of connection. Service line cost under clause 3.1.1 applies to the requisitioned load beyond the assessed load, and not at all where requisitioned load equals assessed load. For extra load or additional connections within the premises beyond the assessed load, service line charges apply under clause 3.1.1. References to 'requisitioned load' in clauses 3.2.3, 3.2.4 and 3.2.5 are modified to mean assessed load.
Third, Contract Demand (p3–4): the CoS and KERC Recovery Regulations limits on CD are removed for HT/EHT supply at 33 kV, 66 kV and 110 kV. CD is instead subject to technical feasibility — voltage regulation and bus voltages within limits, available transformer capacity at substations, and line loadings within thermal ratings. Augmentation charges are prescribed for CD above specified thresholds at each voltage, with collections at 66 kV and above transferred to the transmission licensee. The order ends by directing the office to propose necessary amendments to the relevant CoS/KERC Regulations.
Read with this
The regulation
- Dated 12 Nov 2004Recovery of Expenditure for Supply of Electricity Regulations 2004
Amendments and corrections
- Dated 25 Mar 2005Recovery of Expenditure for Supply of Electricity (Amendment) Regulations, 2005
- Dated 17 Aug 2005Recovery of Expenditure for Supply of Electricity (Second Amendment) Regulations, 2005
- Dated 12 Jan 2006Recovery of Expenditure for Supply of Electricity (Third Amendment) Regulations, 2004
- Dated 24 Aug 2007Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fourth Amendment
- Dated 19 Feb 2010Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fifth Amendment, 2010
- Dated 7 Sep 2011Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Sixth Amendment, 2011
- Dated 25 Aug 2014Recovery of Expenditure for Supply of Electricity (Seventh Amendment) Regulations, 2004
- Dated 22 Nov 2016Recovery of Expenditure for Supply of Electricity (Eighth Amendment) Regulations, 2016
- Dated 27 Dec 2017Recovery of Expenditure for Supply of Electricity (Ninth Amendment) Regulations, 2017
- Dated 11 Dec 2020Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
- Dated 11 Dec 2020Karnataka Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
- Dated 11 Dec 2020Recovery of Expenditure for Supply of Electricity Regulations, 2020 — 11th Amendment
- Dated 11 Jan 2023Conditions of Supply (CoS) Eleventh Amendment and Recovery of Expenditure (RoE) Twelfth Amendment, 2023
6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 amendment not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.