Skip to content

KERC · Karnataka Electricity Regulatory Commission

Karnataka Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020

Conditions of Supply of Electricity of Distribution Licensees in the State of Karnataka (CoS) (Ninth Amendment), 2020, the Karnataka Electricity Regulatory Commission (Recovery of Expenditure for Supply of Eleciricity) (Eleventh Amendment) Regulation 2020 and the Karnataka Electricity Regulatory Commission (Security Deposit) (Second Amendment) Regulations, 2020.

AmendmentDated 11 Dec 2020KERC/CoS/Tech/DDD/05/20-21/976 dated 11.12.2020

Amends the Security Deposit Regulations, 2007.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a single KERC notification dated 11.12.2020 that carries three consequential amendments at once, aimed at speeding up new electricity connections in Karnataka under the Ease of Doing Business (EODB) push. The recitals (pp1–3) record that BESCOM filed OP 21/2020 under clause 46 of the 2006 Conditions of Supply (CoS), that the Government of Karnataka directed BESCOM to reform LT connection timelines and self-certification, that all other distribution licensees were impleaded and filed their own petitions, that draft amendments were published for 30 days of stakeholder comment, and that no public hearing was held because of Covid-19.

Clause 1 (p4) names the three instruments, brings them into force on Gazette publication, and applies them to all distribution licensees and consumers in Karnataka. Clause 2 (pp4–11) sets out the changes in 'as existing' vs 'as amended' tables. In the CoS, the LT eligibility ceilings in clauses 3.02, 9.09 and 31.1(A) are raised so that ordinary LT supply covers installations up to 150 kW, and a new clause 4.10 creates a separate EODB route with its own criteria — notified cities, single installation, specified consumer categories, a load band, a line-extension limit, mandatory documents and an online self-declaration. Payment modes in clause 29.04 are widened to electronic/digital channels per RBI guidelines. The Recovery of Expenditure Regulation amendments extend and re-band the development charges for requisitioned load and add separate commercial/industrial slabs; the Security Deposit amendment adds electronic/digital payment of the initial security deposit. Annexure-12 (pp11–14) is the new declaration format for EODB applicants.

Page 14 also carries an unrelated Karnataka Legal Metrology notification on repairing charges for weights and measures — a mis-bound page, not part of this instrument.

Standard name
Electricity Supply Code, Recovery of Expenditure and Miscellaneous Charges, Security Deposit
Primary topics
New connections and load changes, Conditions of supply, Connection and miscellaneous charges

Read with this

Read with this: Security Deposit Regulations, 2007

The regulation

One more document belongs here and is not on Voltaic: a copy in another language.

It is also read with: Recovery of Expenditure for Supply of Electricity Regulations 2004

Amends the Recovery of Expenditure for Supply of Electricity Regulations 2004.

Procedures and orders made under it

6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 amendment not held as English text.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document