KERC · Karnataka Electricity Regulatory Commission
Recovery of Expenditure for Supply of Electricity (Eighth Amendment) Regulations, 2016
KERC (Recovery of Expenditure for Supply of Electricity) (Eighth Amendment) Regulations, 2016
AmendmentDated 22 Nov 2016KERC/D/14/16-17 dated 22.11.2016
Amends the Recovery of Expenditure for Supply of Electricity Regulations 2004.
Summary
Summary written by software. Check the regulator's original before you rely on it.
It is made under s.181 read with s.46 and s.43(2) of the Electricity Act 2003, extends to the whole of Karnataka, and takes effect from the date of publication in the Karnataka official gazette — that date is not printed (p1–2). The preamble records that BESCOM and consumers asked for the changes, that a draft was notified on 30.06.2016, hosted on the Commission's website and published in newspapers, and that a public hearing was held on 19.10.2016 (p1).
Clause 2 substitutes existing clauses of the 2004 Regulations through a two-column table. It rewrites the notes to clause 3.1.1(A) on how a building with mixed domestic, commercial and power load is classified — a share-of-commercial-load test decides whether the building is treated as residential for common area loads and for arranging supply (p2–3) — and inserts a new clause 3.1.8 allowing a licensee to transfer loads of nearby public-place distribution transformers onto a consumer's own transformer, with augmentation charges for additional load (p3).
The remainder reworks clause 3.2.1 on LT supply in approved layouts: the developer executes the line/plant at own cost and deposits the cost of distribution transformers and allied materials with the licensee under the Deposit Contribution Head, with erection following CEA Technical Standards, 2010 (p3–4). Load-assessment tables convert site area into estimated kW, separately for Bengaluru Urban and Rural districts, other city municipal corporations, town municipal councils, other places and villa layouts (p4–5), with notes requiring the higher of requisitioned and assessed load, transformer sizing using a load diversity factor, and a ceiling on connected load per transformer rating (p6). Execution must be through a licensed contractor to the licensee's estimate, within 180 days; delay triggers cancellation, forfeiture of part of the supervision charges, refund of the balance within 60 days and interest on late refund (p6–7). New layouts must use Aerial Bunched or UG cable for 11 kV and LT lines (p7).
Read with this
The regulation
- Dated 12 Nov 2004Recovery of Expenditure for Supply of Electricity Regulations 2004
Amendments and corrections
- Dated 25 Mar 2005Recovery of Expenditure for Supply of Electricity (Amendment) Regulations, 2005
- Dated 17 Aug 2005Recovery of Expenditure for Supply of Electricity (Second Amendment) Regulations, 2005
- Dated 12 Jan 2006Recovery of Expenditure for Supply of Electricity (Third Amendment) Regulations, 2004
- Dated 24 Aug 2007Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fourth Amendment
- Dated 19 Feb 2010Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fifth Amendment, 2010
- Dated 7 Sep 2011Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Sixth Amendment, 2011
- Dated 25 Aug 2014Recovery of Expenditure for Supply of Electricity (Seventh Amendment) Regulations, 2004
- Dated 27 Dec 2017Recovery of Expenditure for Supply of Electricity (Ninth Amendment) Regulations, 2017
- Dated 11 Dec 2020Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
- Dated 11 Dec 2020Karnataka Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
- Dated 11 Dec 2020Recovery of Expenditure for Supply of Electricity Regulations, 2020 — 11th Amendment
- Dated 11 Jan 2023Conditions of Supply (CoS) Eleventh Amendment and Recovery of Expenditure (RoE) Twelfth Amendment, 2023
Procedures and orders made under it
6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 amendment not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.