Skip to content

KERC · Karnataka Electricity Regulatory Commission

Recovery of Expenditure for Supply of Electricity (Seventh Amendment) Regulations, 2004

KERC (Recovery of Expenditure for Supply of Electricity) (Seventh amendment) Regulations, 2004

AmendmentDated 25 Aug 2014No: KERC/CoS/D/14/14-15 dated 25" August, 2014

Amends the Recovery of Expenditure for Supply of Electricity Regulations 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Seventh Amendment to KERC's 2004 regulations on recovering from applicants the cost of the infrastructure built to supply them. The Commission issued it on 25 August 2014 under s.181 read with s.46 and s.43(2) of the Electricity Act 2003 (p1), after a draft notification, a public hearing on 04.07.2014 and discussions with the ESCOMs on 14 July 2014 (p1). It amends three provisions — clauses 3.1.1, 3.1.5 and 3.2 — takes effect from Karnataka Gazette publication (date not printed), and extends to the whole State (p2).

The bulk of the document is a two-column amendment table showing each clause as existing and as amended (pp2–5). Clause 3.1.1, which lets a licensee recover the cost of the line/plant up to the point of connection for LT supply, is substituted in full: it restates the point of connection as the terminal pole within 30 metres outside the applicant's premises, revises the load-slab basis of recovery, and lifts the load ceiling below which the clause applies from less than 25 kW to less than 35 kW for domestic, commercial and mixed installations (p2). Clause 3.1.5, which obliges an applicant to provide space for a distribution transformer and to lay the line at his own cost, has its trigger raised from 25 kW or 500 sq. metres to 35 kW or 800 sq. metres (pp2–5), with consequential detail on the electrical room, one-time payments, bar on further collection for later load additions, and a list of installations excluded from the clause (pp4–5).

Clause 3.2 is reworked for layouts: the developer executes the extension works at his own cost, deposits the cost of transformers and allied material, agrees to maintain the system until a quarter of the houses are energised, and hands the distribution system to the licensee on completion (pp5–6). A new table estimates layout load from site area (p5). The notification is signed for the Commission by its Secretary (p6).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes, Supply to buildings and colonies

Read with this

Amendments and corrections

Procedures and orders made under it

6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 amendment not held as English text.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document