KERC · Karnataka Electricity Regulatory Commission
Recovery of Expenditure for Supply of Electricity (Seventh Amendment) Regulations, 2004
KERC (Recovery of Expenditure for Supply of Electricity) (Seventh amendment) Regulations, 2004
AmendmentDated 25 Aug 2014No: KERC/CoS/D/14/14-15 dated 25" August, 2014
Amends the Recovery of Expenditure for Supply of Electricity Regulations 2004.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Seventh Amendment to KERC's 2004 regulations on recovering from applicants the cost of the infrastructure built to supply them. The Commission issued it on 25 August 2014 under s.181 read with s.46 and s.43(2) of the Electricity Act 2003 (p1), after a draft notification, a public hearing on 04.07.2014 and discussions with the ESCOMs on 14 July 2014 (p1). It amends three provisions — clauses 3.1.1, 3.1.5 and 3.2 — takes effect from Karnataka Gazette publication (date not printed), and extends to the whole State (p2).
The bulk of the document is a two-column amendment table showing each clause as existing and as amended (pp2–5). Clause 3.1.1, which lets a licensee recover the cost of the line/plant up to the point of connection for LT supply, is substituted in full: it restates the point of connection as the terminal pole within 30 metres outside the applicant's premises, revises the load-slab basis of recovery, and lifts the load ceiling below which the clause applies from less than 25 kW to less than 35 kW for domestic, commercial and mixed installations (p2). Clause 3.1.5, which obliges an applicant to provide space for a distribution transformer and to lay the line at his own cost, has its trigger raised from 25 kW or 500 sq. metres to 35 kW or 800 sq. metres (pp2–5), with consequential detail on the electrical room, one-time payments, bar on further collection for later load additions, and a list of installations excluded from the clause (pp4–5).
Clause 3.2 is reworked for layouts: the developer executes the extension works at his own cost, deposits the cost of transformers and allied material, agrees to maintain the system until a quarter of the houses are energised, and hands the distribution system to the licensee on completion (pp5–6). A new table estimates layout load from site area (p5). The notification is signed for the Commission by its Secretary (p6).
Read with this
The regulation
- Dated 12 Nov 2004Recovery of Expenditure for Supply of Electricity Regulations 2004
Amendments and corrections
- Dated 25 Mar 2005Recovery of Expenditure for Supply of Electricity (Amendment) Regulations, 2005
- Dated 17 Aug 2005Recovery of Expenditure for Supply of Electricity (Second Amendment) Regulations, 2005
- Dated 12 Jan 2006Recovery of Expenditure for Supply of Electricity (Third Amendment) Regulations, 2004
- Dated 24 Aug 2007Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fourth Amendment
- Dated 19 Feb 2010Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Fifth Amendment, 2010
- Dated 7 Sep 2011Recovery of Expenditure for Supply of Electricity Regulations, 2004 — Sixth Amendment, 2011
- Dated 22 Nov 2016Recovery of Expenditure for Supply of Electricity (Eighth Amendment) Regulations, 2016
- Dated 27 Dec 2017Recovery of Expenditure for Supply of Electricity (Ninth Amendment) Regulations, 2017
- Dated 11 Dec 2020Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
- Dated 11 Dec 2020Karnataka Conditions of Supply (Ninth Amendment), Recovery of Expenditure (Eleventh Amendment) and Security Deposit (Second Amendment) Regulations, 2020
- Dated 11 Dec 2020Recovery of Expenditure for Supply of Electricity Regulations, 2020 — 11th Amendment
- Dated 11 Jan 2023Conditions of Supply (CoS) Eleventh Amendment and Recovery of Expenditure (RoE) Twelfth Amendment, 2023
Procedures and orders made under it
6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 amendment not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.