Skip to content

CERC · Central Electricity Regulatory Commission

Draft RLDC Fees and Charges Regulations, 2019 — Explanatory Memorandum

Draft CERC(Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019

Explanatory memorandum to a draftReleased with the notice dated 26 Feb 2019

Explanatory memorandum to the Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is CERC's Explanatory Memorandum to the draft CERC (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019. It explains why the Commission proposes a new fees-and-charges framework for RLDCs and NLDC for the next control period and how the proposal differs from the 2015 regulations (p1–2). It records the earlier 2009 and 2015 regulations and their control periods, and the proposal for 2019–24 (p1–2).

After background, it summarises the salient features. It describes proposed definition changes — including a consolidated Annual LDC Charge, Contingency Reserve, Effective tax rate, Ergonomics, FOLD, LDC Development Fund, Logistics Function, OPEX, other support functions, Schemes and Users (p3–4). It covers registration of users with RLDCs/NLDC, de-registration for persistent default and online registration (p4–5). It explains the application process for determination of fees and charges, including CAPEX/REPEX plans, HR budget, O&M and publication requirements (p6). It proposes annual reconciliation, final truing up and an optional mid-term review (p6–7). It addresses debt-equity treatment for opening capital cost, sharing of refinancing gains, the LDC Development Fund and Contingency Reserve (p7–8).

It then describes the proposed fee structure: a consolidated Annual LDC Charge, equitable sharing among three user categories and apportionment within categories (p8–9). It lists the components of fees and charges and explains HR expenses, HRD expenses, normalisation of prior-period HR costs, communication expenses, performance-linked incentives, certification retainership, KPI-based evaluation and billing/payment changes (p9–15). It notes the proposed depreciation schedule for software and the OPEX model for asset-light services (p15–16). Throughout, the memorandum explains proposals rather than setting out the operative regulation text; it states that unchanged provisions of the 2015 regulations are not repeated (p16).

Primary topics
SLDC and RLDC fees and charges, Operating costs and other income, ARR and true-up

Read with this

Commencement notices and reasons

Other copies of these documents (1)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document