CERC · Central Electricity Regulatory Commission

Detailed Procedure for KPI Calculations for NLDC and RLDCs, 2022

Detailed Procedure for calculations of specific metrics for Key Performance Indicators

ProcedureDated 20 May 2022No.- L-1/153/2019/CERC dated 20th May 2022

Replaced by Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

CERC's order dated 20 May 2022 approves the Detailed Procedure for calculating specific metrics for the Key Performance Indicators (KPIs) that assess NLDC and RLDC performance under the RLDC Fees & Charges Regulations 2019. The order records that NLDC submitted the procedure in 2019 and that CERC approved it with changes; it applies for the whole control period from 1 April 2019 to 31 March 2024 (pp1–2).

The annexed Detailed Procedure explains the KPIs, annual targets, measurement methods, proofs and conversion of performance into marks (pp3–4). It is organised around broad KPI groups. Under Stakeholder Satisfaction, it covers MoU rating, power-market and power-system functioning — short-term open access scheduling and disbursements, REC and ESCerts registry work, backup control centre operation, mock trial runs, FRC computation and reporting, and stakeholder/cross-border meetings (pp5–11). It then sets reliability metrics for frequency and voltage deviation and shutdown-coordination timelines (pp11–14). Website availability and information dissemination KPIs cover RLDC/NLDC websites and web applications, ATC/TTC publication and transaction-schedule uploads (pp14–17). Account-preparation KPIs cover interconnection meter error reporting, ancillary services and AGC reporting (pp17–19).

Financial-prudence KPIs cover capex utilisation variance and statutory compliance audits (pp19–20). Learning-and-growth KPIs cover new technology/R&D, data-intensive reports, certified operators, training man-days and FOLD meetings/workshops (pp20–23). Internal-process KPIs cover SCADA availability, infrastructure and amenities, ISO certification and annual updating of Black Start and Reactive Power documents (pp24–28). Removal-of-difficulties provisions allow POSOCO to seek review if the Regulations change (p28). Appendix I gives the NLDC KPI matrix; Appendix II gives the RLDC KPI matrix, including formulas, targets, proof requirements and mark weightings (pp29–41).

Standard name
SLDC Fees and Charges
Primary topics
SLDC and RLDC fees and charges, Power markets and exchanges, Grid operation and grid code

Read with this

Commencement notices and reasons

Other copies of these documents (1)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.