CERC · Central Electricity Regulatory Commission
Detailed Procedure for KPI Calculations for NLDC and RLDCs, 2022
Detailed Procedure for calculations of specific metrics for Key Performance Indicators
ProcedureDated 20 May 2022No.- L-1/153/2019/CERC dated 20th May 2022
Replaced by Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
CERC's order dated 20 May 2022 approves the Detailed Procedure for calculating specific metrics for the Key Performance Indicators (KPIs) that assess NLDC and RLDC performance under the RLDC Fees & Charges Regulations 2019. The order records that NLDC submitted the procedure in 2019 and that CERC approved it with changes; it applies for the whole control period from 1 April 2019 to 31 March 2024 (pp1–2).
The annexed Detailed Procedure explains the KPIs, annual targets, measurement methods, proofs and conversion of performance into marks (pp3–4). It is organised around broad KPI groups. Under Stakeholder Satisfaction, it covers MoU rating, power-market and power-system functioning — short-term open access scheduling and disbursements, REC and ESCerts registry work, backup control centre operation, mock trial runs, FRC computation and reporting, and stakeholder/cross-border meetings (pp5–11). It then sets reliability metrics for frequency and voltage deviation and shutdown-coordination timelines (pp11–14). Website availability and information dissemination KPIs cover RLDC/NLDC websites and web applications, ATC/TTC publication and transaction-schedule uploads (pp14–17). Account-preparation KPIs cover interconnection meter error reporting, ancillary services and AGC reporting (pp17–19).
Financial-prudence KPIs cover capex utilisation variance and statutory compliance audits (pp19–20). Learning-and-growth KPIs cover new technology/R&D, data-intensive reports, certified operators, training man-days and FOLD meetings/workshops (pp20–23). Internal-process KPIs cover SCADA availability, infrastructure and amenities, ISO certification and annual updating of Black Start and Reactive Power documents (pp24–28). Removal-of-difficulties provisions allow POSOCO to seek review if the Regulations change (p28). Appendix I gives the NLDC KPI matrix; Appendix II gives the RLDC KPI matrix, including formulas, targets, proof requirements and mark weightings (pp29–41).
Read with this
The regulation
Commencement notices and reasons
- Dated 5 Apr 2019RLDC Fees and Charges Regulations, 2019 — Statement of Reasons
Procedures and orders made under it
- Dated 15 Mar 2022Detailed Procedure on Payment of Certificate Retainer-ship, 2022 — Approval Order under the RLDC Fees and Charges Regulations, 2019
- Dated 15 Mar 2022Approval of Detailed Procedure on Methodology of Payment of Certificate Retainership under the RLDC Fees and Charges Regulations, 2019
- Dated 20 May 2022Approval of Detailed Procedure for KPI Metrics under RLDC Fees and Charges Regulations, 2019
- Dated 20 May 2022Detailed Procedure for Calculation of Key Performance Indicators under the Fees and Charges of Regional Load Despatch Centre Regulations, 2019 — control period 1.4.2019 to 31.3.2024
- Dated 30 Nov 2023Removal of Difficulties for Recovery of LDC Charges, RLDC Fees and Charges Regulations, 2019 — Order
- Date not statedCertificate Retainer-ship Payment Procedure under the Fees and Charges of RLDC Regulations, 2019
Other copies of these documents (1)
- Dated 5 Apr 2019RLDC Fees and Charges Regulations, 2019
Earlier drafts
- Dated 26 Feb 2019Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019 — Draft
- Released with the notice dated 26 Feb 2019Explanatory memorandum: Draft RLDC Fees and Charges Regulations, 2019 — Explanatory Memorandum
- Dated 26 Feb 2019Public notice: Public Notice on Draft Regional Load Despatch Centre Fees and Charges Regulations, 2019 — tariff period 1.4.2019 to 31.3.2024
- Released with the notice dated 26 Feb 2019Explanatory memorandum: Capacity Building of Indian Load Despatch Centres (CABIL) Report, December 2018 — Annexure-I to Explanatory Memorandum
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.