Removal of Difficulties for Recovery of Fee and Charges of Load Despatch Centre (LDC) charges in pursuance of the provisions of the Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019.

OrderDated 30 Nov 2023Petition No. 17/SM/2023 dated 30.11.2023

Replaced by Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC suo-motu order (Petition No. 17/SM/2023, dated 30.11.2023) issued under the power to remove difficulties in the CERC (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019. It settles how monthly Load Despatch Centre (LDC) charges are to be computed now that the General Network Access regime has replaced long-term access and medium-term open access.

Pages 1–2 set out the background: the 2019 Regulations were notified on 21 May 2019; Grid-India wrote on 07.11.2023 saying that with the Connectivity and GNA Regulations, 2022 taking effect on 1.10.2023, monthly LDC charges for distribution licensees and buyers should be worked out on GNA instead of contracted long-term/medium-term capacity. The order reproduces Regulation 3(12) and Regulation 30 (the category-wise monthly LDC charge methodology).

Pages 2–3 explain why the old basis fails: Regulation 28 of the Connectivity Regulations, 2009, which made long-term and medium-term customers pay LDC charges, stands repealed with effect from 1.10.2023, and Regulation 40.3 of the GNA Regulations makes those charges payable by GNA grantees.

Page 3 gives the operative direction: LDC charges for distribution licensees, buyers and sellers are to be calculated on their GNA quantum under clauses (b) and (c) of Regulation 30 and under Regulation 31, while inter-State transmission licensees and generating stations continue on the existing basis under clauses (a) and (b) of Regulation 30. The petition is disposed of accordingly.

Standard name
SLDC Fees and Charges
Primary topics
SLDC and RLDC fees and charges, Connectivity and GNA

Read with this

Commencement notices and reasons

Other copies of these documents (1)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document