CERC · Central Electricity Regulatory Commission
Removal of Difficulties for Recovery of LDC Charges, RLDC Fees and Charges Regulations, 2019 — Order
Removal of Difficulties for Recovery of Fee and Charges of Load Despatch Centre (LDC) charges in pursuance of the provisions of the Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019.
OrderDated 30 Nov 2023Petition No. 17/SM/2023 dated 30.11.2023
Replaced by Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a CERC suo-motu order (Petition No. 17/SM/2023, dated 30.11.2023) issued under the power to remove difficulties in the CERC (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019. It settles how monthly Load Despatch Centre (LDC) charges are to be computed now that the General Network Access regime has replaced long-term access and medium-term open access.
Pages 1–2 set out the background: the 2019 Regulations were notified on 21 May 2019; Grid-India wrote on 07.11.2023 saying that with the Connectivity and GNA Regulations, 2022 taking effect on 1.10.2023, monthly LDC charges for distribution licensees and buyers should be worked out on GNA instead of contracted long-term/medium-term capacity. The order reproduces Regulation 3(12) and Regulation 30 (the category-wise monthly LDC charge methodology).
Pages 2–3 explain why the old basis fails: Regulation 28 of the Connectivity Regulations, 2009, which made long-term and medium-term customers pay LDC charges, stands repealed with effect from 1.10.2023, and Regulation 40.3 of the GNA Regulations makes those charges payable by GNA grantees.
Page 3 gives the operative direction: LDC charges for distribution licensees, buyers and sellers are to be calculated on their GNA quantum under clauses (b) and (c) of Regulation 30 and under Regulation 31, while inter-State transmission licensees and generating stations continue on the existing basis under clauses (a) and (b) of Regulation 30. The petition is disposed of accordingly.
Read with this
The regulation
Commencement notices and reasons
- Dated 5 Apr 2019RLDC Fees and Charges Regulations, 2019 — Statement of Reasons
Procedures and orders made under it
- Dated 15 Mar 2022Detailed Procedure on Payment of Certificate Retainer-ship, 2022 — Approval Order under the RLDC Fees and Charges Regulations, 2019
- Dated 15 Mar 2022Approval of Detailed Procedure on Methodology of Payment of Certificate Retainership under the RLDC Fees and Charges Regulations, 2019
- Dated 20 May 2022Approval of Detailed Procedure for KPI Metrics under RLDC Fees and Charges Regulations, 2019
- Dated 20 May 2022Detailed Procedure for Calculation of Key Performance Indicators under the Fees and Charges of Regional Load Despatch Centre Regulations, 2019 — control period 1.4.2019 to 31.3.2024
- Dated 20 May 2022Detailed Procedure for KPI Calculations for NLDC and RLDCs, 2022
- Date not statedCertificate Retainer-ship Payment Procedure under the Fees and Charges of RLDC Regulations, 2019
Other copies of these documents (1)
- Dated 5 Apr 2019RLDC Fees and Charges Regulations, 2019
Earlier drafts
- Dated 26 Feb 2019Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019 — Draft
- Released with the notice dated 26 Feb 2019Explanatory memorandum: Draft RLDC Fees and Charges Regulations, 2019 — Explanatory Memorandum
- Dated 26 Feb 2019Public notice: Public Notice on Draft Regional Load Despatch Centre Fees and Charges Regulations, 2019 — tariff period 1.4.2019 to 31.3.2024
- Released with the notice dated 26 Feb 2019Explanatory memorandum: Capacity Building of Indian Load Despatch Centres (CABIL) Report, December 2018 — Annexure-I to Explanatory Memorandum
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.