CERC · Central Electricity Regulatory Commission
Detailed Procedure on Payment of Certificate Retainer-ship, 2022 — Approval Order under the RLDC Fees and Charges Regulations, 2019
Approval of "Detailed Procedure on Methodology of Payment of Certificate Retainership" under Regulation 33 of the Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019
ProcedureDated 15 Mar 2022No.- L-1/153/2019/CERC dated 15 th March 2022
Replaced by Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A CERC approval order dated 15 March 2022 (p1), signed by Chairperson P. K. Pujari and three Members. It approves a "Detailed Procedure on Methodology of Payment of Certificate Retainer-ship" submitted by NLDC/POSOCO, which is annexed in full to the order (p2). The procedure exists because Regulation 33 of the CERC (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019 — notified 5 April 2019 — required POSOCO to submit such a methodology within two months; NLDC filed it on 29 May 2019 and 2 December 2019 (p1). The Commission examined it, made changes and approved it (p2).
The annexed procedure (pp3–14) sets out roles, responsibilities, eligibility and payment mechanics for the certification of Load Despatch Centre system operators and the retainer-ship paid to those who hold valid certificates. It names the Certification Agency (designated by the Ministry of Power on CEA's recommendation; currently NPTI) and the Nodal Agency (POSOCO's Corporate HRD department), and lays down who may sit the Basic, Specialist and Management level certification examinations and who may then draw the monthly amount.
It fixes the retainer-ship as a flat monthly amount per certification level, capped at the highest applicable slab for operators holding more than one certificate, and provides a three-year certificate validity with renewal to keep "active" status. Sections 10–14 allocate duties to the Certification Agency, the Nodal Agency and LDC heads, fund registration, examination and refresher-training costs from the Load Despatch Centre Development Fund, and prescribe a monthly disbursement cycle driven by certified lists of eligible operators from RLDCs and NLDC. Section 15 permits revision only with the Commission's prior approval. The procedure applies for the control period 1 April 2019 to 31 March 2024 (p2); for SLDCs, ALDCs and sub-LDCs, payment of the retainer-ship is left to the respective State Electricity Regulatory Commissions (p5, p9).
Read with this
The regulation
Commencement notices and reasons
- Dated 5 Apr 2019RLDC Fees and Charges Regulations, 2019 — Statement of Reasons
Procedures and orders made under it
- Dated 15 Mar 2022Approval of Detailed Procedure on Methodology of Payment of Certificate Retainership under the RLDC Fees and Charges Regulations, 2019
- Dated 20 May 2022Approval of Detailed Procedure for KPI Metrics under RLDC Fees and Charges Regulations, 2019
- Dated 20 May 2022Detailed Procedure for Calculation of Key Performance Indicators under the Fees and Charges of Regional Load Despatch Centre Regulations, 2019 — control period 1.4.2019 to 31.3.2024
- Dated 20 May 2022Detailed Procedure for KPI Calculations for NLDC and RLDCs, 2022
- Dated 30 Nov 2023Removal of Difficulties for Recovery of LDC Charges, RLDC Fees and Charges Regulations, 2019 — Order
- Date not statedCertificate Retainer-ship Payment Procedure under the Fees and Charges of RLDC Regulations, 2019
Other copies of these documents (1)
- Dated 5 Apr 2019RLDC Fees and Charges Regulations, 2019
Earlier drafts
- Dated 26 Feb 2019Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019 — Draft
- Released with the notice dated 26 Feb 2019Explanatory memorandum: Draft RLDC Fees and Charges Regulations, 2019 — Explanatory Memorandum
- Dated 26 Feb 2019Public notice: Public Notice on Draft Regional Load Despatch Centre Fees and Charges Regulations, 2019 — tariff period 1.4.2019 to 31.3.2024
- Released with the notice dated 26 Feb 2019Explanatory memorandum: Capacity Building of Indian Load Despatch Centres (CABIL) Report, December 2018 — Annexure-I to Explanatory Memorandum
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.