Detailed Procedure for Calculation of Key Performance Indicators under the Fees and Charges of Regional Load Despatch Centre Regulations, 2019 — control period 1.4.2019 to 31.3.2024

Detailed Procedure for calculation of Key Performance Indicators Under CERC (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019 for the control period from 1.4.2019 to 31.3.2024 notified on 5th April, 2019.

ProcedureDated 20 May 2022

Replaced by Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

What it is. The Detailed Procedure sets out how the performance of the National Load Despatch Centre (NLDC) and each Regional Load Despatch Centre (RLDC) is measured against Key Performance Indicators (KPIs) under Regulation 32(3) of the CERC (Fees and Charges of RLDC and other related matters) Regulations, 2019. It is dated 20 May 2022 and applies to NLDC and RLDCs for the control period 1 April 2019 to 31 March 2024 (p1–2).

How it works. It defines each KPI, sets annual targets, formulates performance computation, identifies proofs of achievement, and maps performance into marks. Total marks are 1000; performance is aggregated and converted into a percentage of annual charges under Regulation 32(5). Marks are rounded to three decimals, with linear pro-rata reduction unless a KPI says otherwise (p2–3).

Part coverage. Stakeholder-satisfaction KPIs cover MoU/DPE rating (p3); power-market and system functioning—STOA scheduling and disbursements, REC registry, ESCerts registry, backup control-centre operation, mock trial runs, FRC computation and stakeholder meetings (p4–9); reliability—frequency and voltage deviation indices and shutdown coordination (p9–12); website availability (p12–13); information dissemination—ATC/TTC publication and implemented schedules (p13–15); and accounts—meter-error reporting, ancillary services and AGC (p15–17). Financial-prudence KPIs cover capex variance and statutory audits (p17–18). Learning-and-growth KPIs cover technology adoption/R&D, reports, operator certification, training man-days and FOLD workshops (p18–22). Internal-process KPIs cover SCADA availability, infrastructure amenities, ISO certification and process documentation (p22–26). Section 20 allows POSOCO to seek CERC approval for review in case of difficulty or amendment to the underlying Regulations (p26).

Appendices. Appendix-I (p27–33) gives NLDC KPI formulations, weights and a worked mark calculation; Appendix-II (p34–39) does the same for RLDCs. The appendices mix normative formulas with illustrative actual values and totals, so they are best read as the calculation sheets (p27–39).

Standard name
SLDC Fees and Charges
Primary topics
Grid operation and grid code, Scheduling and despatch, Power markets and exchanges

Read with this

Commencement notices and reasons

Other copies of these documents (1)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document