CERC · Central Electricity Regulatory Commission
Detailed Procedure for Calculation of Key Performance Indicators under the Fees and Charges of Regional Load Despatch Centre Regulations, 2019 — control period 1.4.2019 to 31.3.2024
Detailed Procedure for calculation of Key Performance Indicators Under CERC (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019 for the control period from 1.4.2019 to 31.3.2024 notified on 5th April, 2019.
ProcedureDated 20 May 2022
Replaced by Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
What it is. The Detailed Procedure sets out how the performance of the National Load Despatch Centre (NLDC) and each Regional Load Despatch Centre (RLDC) is measured against Key Performance Indicators (KPIs) under Regulation 32(3) of the CERC (Fees and Charges of RLDC and other related matters) Regulations, 2019. It is dated 20 May 2022 and applies to NLDC and RLDCs for the control period 1 April 2019 to 31 March 2024 (p1–2).
How it works. It defines each KPI, sets annual targets, formulates performance computation, identifies proofs of achievement, and maps performance into marks. Total marks are 1000; performance is aggregated and converted into a percentage of annual charges under Regulation 32(5). Marks are rounded to three decimals, with linear pro-rata reduction unless a KPI says otherwise (p2–3).
Part coverage. Stakeholder-satisfaction KPIs cover MoU/DPE rating (p3); power-market and system functioning—STOA scheduling and disbursements, REC registry, ESCerts registry, backup control-centre operation, mock trial runs, FRC computation and stakeholder meetings (p4–9); reliability—frequency and voltage deviation indices and shutdown coordination (p9–12); website availability (p12–13); information dissemination—ATC/TTC publication and implemented schedules (p13–15); and accounts—meter-error reporting, ancillary services and AGC (p15–17). Financial-prudence KPIs cover capex variance and statutory audits (p17–18). Learning-and-growth KPIs cover technology adoption/R&D, reports, operator certification, training man-days and FOLD workshops (p18–22). Internal-process KPIs cover SCADA availability, infrastructure amenities, ISO certification and process documentation (p22–26). Section 20 allows POSOCO to seek CERC approval for review in case of difficulty or amendment to the underlying Regulations (p26).
Appendices. Appendix-I (p27–33) gives NLDC KPI formulations, weights and a worked mark calculation; Appendix-II (p34–39) does the same for RLDCs. The appendices mix normative formulas with illustrative actual values and totals, so they are best read as the calculation sheets (p27–39).
Read with this
The regulation
Commencement notices and reasons
- Dated 5 Apr 2019RLDC Fees and Charges Regulations, 2019 — Statement of Reasons
Procedures and orders made under it
- Dated 15 Mar 2022Detailed Procedure on Payment of Certificate Retainer-ship, 2022 — Approval Order under the RLDC Fees and Charges Regulations, 2019
- Dated 15 Mar 2022Approval of Detailed Procedure on Methodology of Payment of Certificate Retainership under the RLDC Fees and Charges Regulations, 2019
- Dated 20 May 2022Approval of Detailed Procedure for KPI Metrics under RLDC Fees and Charges Regulations, 2019
- Dated 20 May 2022Detailed Procedure for KPI Calculations for NLDC and RLDCs, 2022
- Dated 30 Nov 2023Removal of Difficulties for Recovery of LDC Charges, RLDC Fees and Charges Regulations, 2019 — Order
- Date not statedCertificate Retainer-ship Payment Procedure under the Fees and Charges of RLDC Regulations, 2019
Other copies of these documents (1)
- Dated 5 Apr 2019RLDC Fees and Charges Regulations, 2019
Earlier drafts
- Dated 26 Feb 2019Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019 — Draft
- Released with the notice dated 26 Feb 2019Explanatory memorandum: Draft RLDC Fees and Charges Regulations, 2019 — Explanatory Memorandum
- Dated 26 Feb 2019Public notice: Public Notice on Draft Regional Load Despatch Centre Fees and Charges Regulations, 2019 — tariff period 1.4.2019 to 31.3.2024
- Released with the notice dated 26 Feb 2019Explanatory memorandum: Capacity Building of Indian Load Despatch Centres (CABIL) Report, December 2018 — Annexure-I to Explanatory Memorandum
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.