RLDC Fees and Charges Regulations, 2019

Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019

Regulation · Gazette copyDated 5 Apr 2019Published in the Gazette 21 May 2019No.L-1/153/2019/CERC dated 5th April, 2019

Replaced by Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 52 of 82. Check the regulator's original before you rely on it.

This is CERC’s principal regulation for the fees and charges that Regional Load Despatch Centres and the National Load Despatch Centre collect from grid users. It was notified on 5 April 2019 and published in the Gazette on 21 May 2019; it takes effect on Gazette publication and is meant to apply for the control period 1.4.2019–31.3.2024 unless reviewed or extended (p43). Chapter 1 sets the title, commencement, scope and definitions, including who counts as a “user” (pp43–45). Chapter 2 governs registration for grid access, describes RLDC/NLDC functions under logistics, market operation, registry and system operation, describes the “Scheme” of facilities and equipment, identifies special users such as SSP, DVC and BBMB and cross-border agencies, and requires CAPEX/REPEX and OPEX plans with the tariff petition (pp45–50). Chapter 3 sets the application process for determination of fees and charges, the separate determination for each RLDC/NLDC, prudence-check principles, and truing up, including continued billing on previous approved charges during pendency and after the control period, and a mid-term review window (pp50–52). Chapter 4 begins the computation of capital cost and additional capitalisation/de-capitalisation (p52). The Gazette also contains a large set of appendices/forms, notably application formats (Appendix-I), public notice format (Appendix-II) and registration format (Appendix-IV), with tables for CAPEX/OPEX and truing-up data (pp20–42).

Standard name
SLDC Fees and Charges
Primary topics
SLDC and RLDC fees and charges, Tariff determination, Multi Year Tariff (MYT)

Read with this

Commencement notices and reasons

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document