CERC · Central Electricity Regulatory Commission
RLDC Fees and Charges Regulations, 2019 — Statement of Reasons
Statement of Reasons (SoR)
Statement of reasonsDated 5 Apr 2019No.- L-1/153/2019/CERC
Replaced by Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Statement of Reasons (SoR) issued by the Central Electricity Regulatory Commission with the final CERC (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019 (p1). It is not the operative regulation: it records why the Commission accepted, rejected or deferred stakeholder comments on the draft notified on 26.2.2019 and describes what changed between draft and final text.
Paragraphs 1.1–1.4 give the background. The draft was issued with an Explanatory Memorandum and drew comments from POSOCO, GRIDCO, GUVNL and PCKL, with POSOCO also making oral submissions at a public hearing on 20.3.2019 (p1–2). The Commission states that the review drew on the CABIL report, "Capacity Building of Indian Load Despatch Centres", produced by a sub-group of the Forum of Regulators' Standing Technical Committee and accepted at the FOR's 65th meeting on 13.11.2018, as well as model LDC fees-and-charges regulations (p1–2).
The bulk of the document (paragraphs 2–20, pp2–14) goes through the draft clause by clause — Regulations 4(a), 5(4), 7(1), 10(5), 10(9), 14(4), 16, 19(2), 22(2), 23, 25, 29(2), 32, 33, 35 and 37, then Form 6B, Appendix III, Appendix V and Appendix VI. Each paragraph states the comment and the "Analysis and decision", quoting the revised wording wherever the draft text was changed.
Recurring themes are parity with CERC's Tariff Regulations, 2019 for return on equity, debt-equity, O&M escalation, late payment surcharge and rebate (p4–5, p11); new OPEX heads covering data, forecasting and software services (p6); a reworked performance-linked incentive and KPI set, with the Commission noting that performance under the old and new KPIs is not comparable (p8–9); and institution-building measures, including a certification-linked incentive for SLDC staff and procedures POSOCO must submit to the Commission (p10, p13). Several POSOCO requests were accepted outright, while most beneficiary objections to charge levels were rejected.
Read with this
The regulation
Procedures and orders made under it
- Dated 15 Mar 2022Detailed Procedure on Payment of Certificate Retainer-ship, 2022 — Approval Order under the RLDC Fees and Charges Regulations, 2019
- Dated 15 Mar 2022Approval of Detailed Procedure on Methodology of Payment of Certificate Retainership under the RLDC Fees and Charges Regulations, 2019
- Dated 20 May 2022Approval of Detailed Procedure for KPI Metrics under RLDC Fees and Charges Regulations, 2019
- Dated 20 May 2022Detailed Procedure for Calculation of Key Performance Indicators under the Fees and Charges of Regional Load Despatch Centre Regulations, 2019 — control period 1.4.2019 to 31.3.2024
- Dated 20 May 2022Detailed Procedure for KPI Calculations for NLDC and RLDCs, 2022
- Dated 30 Nov 2023Removal of Difficulties for Recovery of LDC Charges, RLDC Fees and Charges Regulations, 2019 — Order
- Date not statedCertificate Retainer-ship Payment Procedure under the Fees and Charges of RLDC Regulations, 2019
Other copies of these documents (1)
- Dated 5 Apr 2019RLDC Fees and Charges Regulations, 2019
Earlier drafts
- Dated 26 Feb 2019Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019 — Draft
- Released with the notice dated 26 Feb 2019Explanatory memorandum: Draft RLDC Fees and Charges Regulations, 2019 — Explanatory Memorandum
- Dated 26 Feb 2019Public notice: Public Notice on Draft Regional Load Despatch Centre Fees and Charges Regulations, 2019 — tariff period 1.4.2019 to 31.3.2024
- Released with the notice dated 26 Feb 2019Explanatory memorandum: Capacity Building of Indian Load Despatch Centres (CABIL) Report, December 2018 — Annexure-I to Explanatory Memorandum
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.