CERC · Central Electricity Regulatory Commission
Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019 — Draft
Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019
Draft regulationDated 26 Feb 2019No.L-1/153/2019/CERC dated 26.2.2019
Draft
A proposal that has since been finalised as the Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
These are CERC's draft regulations for the fees and charges that Regional Load Despatch Centres and the National Load Despatch Centre collect from grid users, issued as a draft notification dated 26.2.2019 (p1). They would take effect from Gazette publication and apply for the control period 1.4.2019 to 31.3.2024, unless reviewed earlier or extended (p1).
Chapter 1 (p1–5) sets title, commencement, scope and the working vocabulary — annual LDC charges, fees versus charges, CAPEX/REPEX/OPEX, capital cost, control period, LDC Development Fund, contingency reserve, 'user', 'regional entity' and 'grid access'. The provisions on registration, the funded functions of RLDCs/NLDC and the capital and operating expenditure plans (regulations 4–9, p6–12) require users to register online with the concerned RLDC/NLDC, set scrutiny and de-registration rules, enumerate logistics, market operation, registry and system operation functions, and identify who counts as a separate user.
Chapter 3 (p13–15) lays down the petition, publication, prudence-check, truing-up and mid-term review procedure, including billing during pendency and after the control period. Chapter 4 (p16–17) specifies how capital cost, additional capitalisation, de-capitalisation and the debt-equity ratio are computed. Chapter 5 (p18) defines the components of RLDC fees and charges and of Annual LDC Charges. Chapter 6 (p19–23) gives the computation methodology for each ALC component — return on equity, interest on loan, depreciation, O&M, OPEX, human resource expenses and interest on working capital — and for NLDC and corporate office expenses. Chapter 7 (p24–25) creates the LDC Development Fund and the Contingency Reserve and their permitted uses. Chapter 8 (p26–28) sets registration fees by user category and capacity slab and the formulae and monthly recovery mechanism for LDC charges, with the SLDC as nodal collection agency. The sections on performance-linked incentive (p29–30) and billing and miscellaneous provisions (p31–32) cover KPIs, certification retainer-ship, billing, late payment surcharge, rebate, foreign exchange variation, dispute resolution, power to relax and removal of difficulty. Appendices (p33–65) supply the tariff filing forms, public notice format, depreciation schedule, registration format, KPI assessment and HR requirement projection.
Read with this
The regulation
Commencement notices and reasons
- Dated 5 Apr 2019RLDC Fees and Charges Regulations, 2019 — Statement of Reasons
Procedures and orders made under it
- Dated 15 Mar 2022Detailed Procedure on Payment of Certificate Retainer-ship, 2022 — Approval Order under the RLDC Fees and Charges Regulations, 2019
- Dated 15 Mar 2022Approval of Detailed Procedure on Methodology of Payment of Certificate Retainership under the RLDC Fees and Charges Regulations, 2019
- Dated 20 May 2022Approval of Detailed Procedure for KPI Metrics under RLDC Fees and Charges Regulations, 2019
- Dated 20 May 2022Detailed Procedure for Calculation of Key Performance Indicators under the Fees and Charges of Regional Load Despatch Centre Regulations, 2019 — control period 1.4.2019 to 31.3.2024
- Dated 20 May 2022Detailed Procedure for KPI Calculations for NLDC and RLDCs, 2022
- Dated 30 Nov 2023Removal of Difficulties for Recovery of LDC Charges, RLDC Fees and Charges Regulations, 2019 — Order
- Date not statedCertificate Retainer-ship Payment Procedure under the Fees and Charges of RLDC Regulations, 2019
Other copies of these documents (1)
- Dated 5 Apr 2019RLDC Fees and Charges Regulations, 2019
Earlier drafts
- Released with the notice dated 26 Feb 2019Explanatory memorandum: Draft RLDC Fees and Charges Regulations, 2019 — Explanatory Memorandum
- Dated 26 Feb 2019Public notice: Public Notice on Draft Regional Load Despatch Centre Fees and Charges Regulations, 2019 — tariff period 1.4.2019 to 31.3.2024
- Released with the notice dated 26 Feb 2019Explanatory memorandum: Capacity Building of Indian Load Despatch Centres (CABIL) Report, December 2018 — Annexure-I to Explanatory Memorandum
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.