Skip to content

CERC · Central Electricity Regulatory Commission

Capacity Building of Indian Load Despatch Centres (CABIL) Report, December 2018 — Annexure-I to Explanatory Memorandum

CAPACITY BUILDING OF INDIAN LOAD DESPATCH CENTRES CABIL

Explanatory memorandum to a draftReleased with the notice dated 26 Feb 2019

Explanatory memorandum to the Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2019 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is the December 2018 report Capacity Building of Indian Load Despatch Centres (CABIL), prepared by a sub-group of the Forum of Regulators' Standing Technical Committee and presented as Annexure-I to an Explanatory Memorandum (p1). The Standing Technical Committee endorsed it at its 21st meeting on 8 October 2018 and the Forum of Regulators endorsed it at its 65th meeting on 13 November 2018; it was released at that meeting in Bhubaneswar (p15, p23).

The executive summary (pp16–24) frames the report around the historical mandate for LDCs, emerging grid and market challenges, LDC diversity, civil infrastructure, decision-support systems, data management, real-time operating teams, human-resource adequacy and talent retention, the LDC business model, KPIs and benchmarking. It closes with the 65th FOR meeting's directions: disseminate the report to SERCs/JERCs and have the Standing Technical Committee monitor implementation (p24).

Chapter 1 (pp25–31) gives the background timeline, the sub-group's formation, terms of reference, members, methodology—11 meetings, LDC visits and surveys—and the questions framing the work. It expressly scopes out technical grid-operation and market-design issues (p31). Chapter 2 begins the stakeholder-interface analysis with generating companies (p32).

The table of contents (pp3–10) shows the rest of the report: functional activities, human resources, infrastructure and ergonomics, decision support, ICT, data governance, FOLD, business model, KPIs and recommendations/roadmap. Annexures include SERC fee regulations, situational-awareness material, KPI extracts, a CERC order, the FOLD charter and a literature review; a model fees-and-charges regulation and its forms appear later (p7, pp272–296).

Standard name
SLDC Fees and Charges
Primary topics
SLDC and RLDC fees and charges, Cyber security, Communication and SCADA

Read with this

Commencement notices and reasons

Other copies of these documents (1)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document