Search the library
Filters
Topicclear
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
Showing the best matches for “energy storage obligation”: 9 documents. There may be more. Add words, or choose a regulator or a type, to narrow the search.
The state and topic filters do not apply to a word search yet; the regulator, document type and year filters do.
Detailed Procedure for Allocation of Transmission Corridor for GNA and T-GNA Scheduling under GNA Regulations, 2022 — 2023
- 2. Definitions… including based on a renewable source of energy with or without Energy Storage System including Renewable Hybrid Generating Station for meeting its auxiliary consumption or start-up power or for meeting its supply obligations in terms of …
- 2. DefinitionsStandalone Energy Storage System, Generating station based on a renewable source of energy with or without Energy Storage System including Renewable Hybrid Generating Station for drawal during non-generation hours as buyers. …
3 matching passages in this document
Procedure of verification of status of CGP, 2024
- Section 9 Captive Generation… of electricity by the captive user may be either directly or through Energy Storage System: Provided further that the consumption by a subsidiary company as defined in clause (87) of section 2 of the Companies Act, 2013 (18 of 2013) or …
- 9. Verification of the consumption criteria of CGP as …… Technical losses in electrical network and energy storage system shall be included in the energy consumption of the captive users. The losses figures shall be as derived from the published data wherever its done at regular intervals and …
3 matching passages in this document
Revised Procedure for Grant of Connectivity to Projects based on Renewable Sources to ISTS
- 5 Nature of the Applicant5 Nature of the Applicant Renewable Energy generating station Renewable Energy generating station as lead generator Renewable power Park developer Renewable Energy Implementing Agency Project based on stand-alone storage 6 Criterion for …
- 3. Address › 4. Eligibility… grantee shall be responsible for all operational and commercial obligations of the concerned renewable energy generating station(s) including compliance with the provisions of the Grid Code and other regulations of the Commission, …
3 matching passages in this document
Banking Facility for Solar Captive Power Plants Order, 2023
- Objections Received › Response of PSPCL… Further, while allowing the facility of banking the discom acts as an energy storage system which is used by the generator for storing its surplus energy for later use. The average cost of Battery Energy Storage System comes out to …
- Objections Received › Response of PSPCL… is applicable only on the banked energy to carried forward to next month and not on the whole energy banked during the month. Moreover, while allowing the facility of banking the distribution company acts as an energy storage system …
3 matching passages in this document
Detailed Procedure for Grant of Connectivity to Renewable Projects to ISTS
- 4. EligibilityAn entity intending to set-up generation projects based on renewable energy sources including hybrid projects on renewables and storage for a capacity of 50 MW or above:, (ii) An entity acting as a Lead Generator on behalf of the …
- DETAILED PROCEDURE FOR "GRANT OF CONNECTIVITY TO PROJECTS … › 2. Applicability… i) Generation projects based on renewable energy sources, including hybrid projects based on renewables and storage, Solar Power Park Developer, Wind Power Park Developer, Wind-Solar Power Park Developer and Power park developer based on …
3 matching passages in this document
RE Curtailment Management Procedure for Wind and Solar Generation, 2024
- Table of Contents › 4.0. Definitions… of Wind or Solar Energy Generators means the cumulative capacity rating of the Wind turbines, Solar inverters or Solar thermal generators that are capable of generating power in a given time block as declared by such Generators or …
- Table of Contents › 4.0. Definitions… or a single agency appointed by the majority of the Wind or Solar Energy Generators in the State in terms of installed capacity, to perform the functions and discharge the obligations specified in these Regulations. …
3 matching passages in this document
Procedure for Grant of Connectivity to the Distribution System, 33 kV and below — under Grid Connectivity and Intra State Open Access Regulations, 2014
- TERMS AND CONDITIONS.-… If both the main meter and the check meter fail to record energy either due to the blowing of the P.T. fuses or due to any other causes, the energy imported or exported may be arrived at based on the standby meter, if available, or by …
- 3.11. Interchange of power with the grid › 4.0. Provision of interface meters… Energy accounting and settlement shall be done in 15 minutes block. From the energy / demand recorded in the Consumer meter, OA entitlement shall first be adjusted to arrive at energy / demand consumption from DISCOM. …
3 matching passages in this document
Procedure for Grant of Connectivity to the Intra-State Transmission System
- 3.11. Interchange of power with the grid › 4.0. Provision of interface meters… Energy accounting and settlement shall be done in 15 minutes block. From the energy / demand recorded in the Consumer meter, OA entitlement shall first be adjusted to arrive at energy / demand consumption from DISCOM. 4.2. …
- 4. Operation and Maintenance:- › 5. Metering Arrangements:-… If both the main meter and the check meter fail to record energy either due to the blowing of the P.T. fuses or due to any other causes, the energy imported or exported may be arrived at based on the standby meter, if available, or by …
3 matching passages in this document
Draft Procedure for Verification of Captive Status of Generating Plants in Telangana
Draft