Detailed Procedure for Grant of Connectivity to Renewable Projects to ISTS

DETAILED PROCEDURE FOR "GRANT OF CONNECTIVITY TO PROJECTS BASED ON RENEWABLE SOURCES TO INTER-STATE TRANSMISSION SYSTEM"

ProcedureDate not stated

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 48 of 60. Check the regulator's original before you rely on it.

This is the detailed procedure under Regulation 27 of the CERC Connectivity Regulations, 2009, for granting connectivity to renewable energy projects to the inter-State transmission system (ISTS) (p1). It applies to renewable generation projects and hybrid renewable-plus-storage projects, solar/wind/wind-solar/hybrid power park developers, and to CTU, SECI and other designated agencies, MNRE, RLDCs, SLDCs, STUs and distribution companies (p1). It comes into force when notified by the Commission, except wind, wind-solar, solar and hybrid park developers/projects authorized by government, for which a separate notification date applies (p1). Applications are handled in two stages, Stage-I and Stage-II connectivity (p1–2).

Clauses 3–5 set the CTU contact point, eligibility and transition rules. Stage-I applicants must be renewable projects of 50 MW or above, a lead generator for projects aggregating 50 MW or above, or government-authorized park developers; already-connected capacity cannot get additional connectivity for the same project (p2). A transition table converts existing connectivity/LTA holders into deemed Stage-I or Stage-II grantees with deadlines to submit documents (p3–4). Connectivity can be used by wholly owned subsidiaries/SPVs, with the parent as lead generator and a lock-in after supply begins (p4). Dedicated line bays are generally developer-scope while terminal ISTS bays are transmission licensee-scope (p5).

Clauses 6–8 provide the Stage-I application and grant process: online form, documents, fees, deficiency correction, forfeiture and closure rules, a fixed window to move to Stage-II, CTU study and grant within 60 days, primary/alternate locations, a capacity table for dedicated transmission lines, and quarterly progress monitoring (p5–8). Clauses 9–11 cover Stage-II: eligibility through competitive bidding or land/financial-closure milestones, post-grant milestones and revocation, monthly processing, bay allocation, transmission agreement, Conn-BG, LTA, and quarterly monitoring; failure to complete the dedicated line within the stated period triggers BG encashment and revocation (p8–13).

Clauses 12–16 specify technical requirements by reference to CEA standards for dedicated transmission lines and pooling stations, additional-capacity applications, sharing of dedicated transmission infrastructure and lead-generator duties, utilization monitoring of pooling stations, and transmission planning coordinated with MNRE (p13–18). Annexures pp19–39 supply affidavit, application, intimation, monitoring, enhancement, bank guarantee and utilization formats.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Technical standards, Open access

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document