Skip to content

CERC · Central Electricity Regulatory Commission

Detailed Procedure for Allocation of Transmission Corridor for GNA and T-GNA Scheduling under GNA Regulations, 2022 — 2023

Approval of 'Detailed Procedure for Allocation of Transmission Corridor for Scheduling of General Network Access and Temporary General Network Access under Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022

ProcedureDated 29 Sep 2023No. L-1/261/2021/CERC dated 29.09.2023

Made under the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC order of 29 September 2023 (No. L-1/261/2021/CERC) approving the Detailed Procedure that NLDC submitted on 14 July 2023 for allocating inter-State transmission corridor among users of General Network Access and Temporary GNA. The order proper takes only two pages: it records that NLDC was required to prepare the procedure under Regulation 39.2 of the GNA Regulations 2022, that the Commission examined it and approved it with suitable changes under the proviso to that regulation, and that the approved text is annexed (p1–2).

The annexed procedure (p3–16) is the operative document. Section 1 says it supplements NLDC's NOAR procedure for T-GNA and confirms that provisions for GNA applicants apply equally to GNARE, and for T-GNA applicants to T-GNARE, without being repeated (p3). Section 2 defines who counts as an Applicant — licensees, bulk consumers, drawee entities, generating stations including renewables and storage, captive plants, traders and power exchanges (p3–4). Section 4 governs declaration of TTC, ATC and TRM: CTUIL must pass NLDC the import/export ATC it used when granting GNA, and the figures plus their basis and constraints must be published eleven months ahead (p5–6).

Section 5 is the core. It fixes the order in which corridor is handed out — GNA grantees first, then advance T-GNA over the residual margin, then IDAM collective transactions, then exigency bilateral T-GNA, then the real-time market — and for each category gives the available-margin formula, pro-rata sharing when corridor is short, curtailment sequencing (high-price day-ahead first), the conditions for refund or non-refund of transmission charges, and the sequence for releasing balance corridor on a first-come basis (p6–15). Section 5.7 sets the time-block rules for schedule revision and curtailment under real-time congestion, including deemed scheduling in the interim blocks (p15–16). Section 6 leaves revision of the procedure to NLDC with Commission approval (p16).

Appendix-I (p17–31) is a companion Procedure for Assessment of Transfer Capability: its own definitions (p18–19); a responsibility-and-timeline table for SLDCs, RLDCs and NLDC at M-12, M-6 and M-1 horizons with three sets of base cases each month (p19–22); simulation methodology for TTC, TRM and ATC covering study scenarios, network and RE modelling, load set-points, outage plans, unit commitment by fuel, reactive dispatch, import/export capability build-up and TRM sizing (p23–29); declaration and publication requirements (p29–30); and interconnection studies for new elements (p30–31). Format-I and Format-II (p32–34) prescribe the TTC declaration and node-wise load data formats.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Scheduling and despatch, Congestion and curtailment

Read with this

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document